Commit graph

16 commits

Author SHA1 Message Date
Arthur Bassi
a43de20ed4 fix(work-orders): ignore cancelled dispatches in detail closability (SH-183) 2026-08-19 12:02:17 -03:00
Arthur Bassi
1554cf30d0 fix(work-orders): require vendor company not technician to complete (SH-183) 2026-08-19 11:49:19 -03:00
arthur.bassi
ce6e19ebaa Merge remote-tracking branch 'origin/dev' into feature/sh-114-wo-closability-gate
# Conflicts:
#	src/app/(protected)/workorders/_components/list/table/cells/status-cell.tsx
#	src/domain/work-orders/utils/wo-closability.ts
#	src/test/domain/work-orders/utils/wo-closability.test.ts
2026-08-18 21:18:49 -03:00
arthur.bassi
a109a68f40 fix(work-orders): keep SH-188 tooltip when mixed with other gaps
Stop copying WO lifecycle status into uplift primaryStatus on flat board rows.
2026-08-18 17:28:14 -03:00
arthur.bassi
37a6098ecb fix(work-orders): require company not technician for Completed (SH-183) 2026-08-17 13:54:05 -03:00
Arthur Bassi
5d7ac297e4 fix(work-orders): drop vendor string from Completed closability (SH-114) 2026-08-14 10:55:06 -03:00
Arthur Bassi
1835a5939a fix(work-orders): dedupe completedDate and gate Completed on technician (SH-188)
Refresh onto current dev and resolve exact-head review blockers:

- Remove duplicate WorkOrderBoardRowApi.completedDate after merge with dev

- Add SH-114 Technician closability gate alongside company/vendor check

- Update wo-closability regressions for missing technician
2026-08-13 15:21:16 -03:00
Arthur Bassi
8a221c8819 fix(work-orders): consume board pendingUpliftCount for SH-188 gate
Map the authoritative board/search/detail pendingUpliftCount into the
Completed closability gate and align the pending-uplift tooltip with SH-188.
2026-08-12 09:55:34 -03:00
arthur.bassi
dd60b1d72e fix(work-orders): allow comp-doc generate without existing completion document
canGenerateCompDoc now ignores the completion-document closability gap so PM/Overdue drafts can enter generation.

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-08-11 15:28:00 -03:00
arthur.bassi
67c4ee8119 fix(work-orders): only block Completed on evidenced pending uplift
Absence of optional uplift fields means no pending, per SH-188.
2026-08-11 15:28:00 -03:00
arthur.bassi
a3e9a20477 fix(work-orders): fail closed on unknown uplift status 2026-08-11 15:28:00 -03:00
arthur.bassi
6b415f732c fix(work-orders): unify closability with sh-114 and pending uplift 2026-08-11 15:26:21 -03:00
arthur.bassi
f5414e4b14 feat(work-orders): block completed when uplift is pending 2026-08-11 15:26:21 -03:00
arthur.bassi
5e3b7b8057 fix(work-orders): use authoritative type/doc/media for detail closability
Stop treating integration source as WorkOrderType.
Enrich detail from board detail for SH-114/SH-183 gates.

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-08-11 14:06:54 -03:00
arthur.bassi
8cd6d92ba7 fix(work-orders): map detail problem and source into closability
detailToClosabilityInput now uses WorkOrderDetail.problem as pm and source as WO type so Done is not permanently blocked by a false Service gap.

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-08-10 19:11:35 -03:00
Arthur Bassi
c850be2aeb fix(work-orders): compare completion labels via string helper
[recover] remove malicious eslint payload (was 19dfa0f9)
2026-08-10 17:12:14 -03:00