Commit graph

5 commits

Author SHA1 Message Date
dependabot[bot]
34727571c2
Bump aws-cdk-lib in /cdk in the minor-and-patch group
Bumps the minor-and-patch group in /cdk with 1 update: [aws-cdk-lib](https://github.com/aws/aws-cdk).


Updates `aws-cdk-lib` from 2.253.1 to 2.257.0
- [Release notes](https://github.com/aws/aws-cdk/releases)
- [Changelog](https://github.com/aws/aws-cdk/blob/main/CHANGELOG.v2.alpha.md)
- [Commits](https://github.com/aws/aws-cdk/compare/v2.253.1...v2.257.0)

---
updated-dependencies:
- dependency-name: aws-cdk-lib
  dependency-version: 2.257.0
  dependency-type: direct:production
  update-type: version-update:semver-minor
  dependency-group: minor-and-patch
...

Signed-off-by: dependabot[bot] <support@github.com>
2026-05-29 17:15:40 +00:00
Adam Moussa
f86b4ba1c5
Merge pull request #6 from Sea-Haven-Industries/feature/phase-0-scaffold
Phase 0: scaffold apm-wo-analysis repository
2026-05-29 13:14:37 -04:00
Adam Moussa
611979e44e Temporarily disable CD deploy during stack merges
Gate the deploy job with if:${{ false }} so merging the Phase 0-5 stack into
main does not fire cdk deploy --all on every merge. Both stacks are already
deployed manually and validated in prod. Re-enable at the start of Phase 6 by
reverting this commit.
2026-05-29 11:43:48 -04:00
Adam Moussa
58b91bda70 Scaffold apm-wo-analysis repository
Stand up the Phase 0 CDK scaffold for the daily APM work-order
analysis pipeline: two-stack CDK app (pipeline + grafana), classifier
and slack-post Lambda packages, dashboards-as-code, the local
drop-folder uploader, and a classifier smoke-test placeholder.

Wire CI/CD to the org reusable workflows: ci.yaml -> ci-python-sam
(ruff + cdk synth) and deploy.yaml -> cd-cdk (OIDC, cdk deploy --all).
Pin aws-cdk-lib==2.253.1; Lambdas target Python 3.12 / arm64.

Rewrite .gitignore to the org Python-CDK standard so the source-of-
truth files (CLAUDE.md, docs/, .claude/agents) are tracked while build
artifacts (.venv, cdk.out, caches) stay ignored.

Domain logic, stack resources, and dashboards are stubbed and filled
in across Phases 1-5 (docs/BUILD.md). cdk synth is green for both
stacks; ruff check/format pass.
2026-05-28 16:13:13 -04:00
Adam Moussa
f24ded21a7 Add project README 2026-05-28 16:13:01 -04:00