Temporarily disable CD deploy during stack merges

Gate the deploy job with if:${{ false }} so merging the Phase 0-5 stack into
main does not fire cdk deploy --all on every merge. Both stacks are already
deployed manually and validated in prod. Re-enable at the start of Phase 6 by
reverting this commit.
This commit is contained in:
Adam Moussa 2026-05-29 11:43:48 -04:00
parent 58b91bda70
commit 611979e44e

View file

@ -13,6 +13,11 @@ concurrency:
jobs:
deploy:
# TEMPORARILY DISABLED while the Phase 0–5 stack is merged into main, so each
# merge to main does NOT trigger `cdk deploy --all`. Re-enable when starting
# Phase 6 by removing this `if:` line (revert this commit). The pipeline +
# grafana stacks are already deployed (manually) and validated in prod.
if: ${{ false }}
uses: Sea-Haven-Industries/.github/.github/workflows/cd-cdk.yaml@main
with:
python-version: "3.12"