Commit graph

159 commits

Author SHA1 Message Date
arthur.bassi
f460d7854e fix(work-orders): satisfy additionalContacts fixtures and inline row max-lines 2026-08-12 10:32:37 -03:00
arthur.bassi
702a791404 Merge remote-tracking branch 'origin/dev' into feature/wo-multi-poc-contacts
# Conflicts:
#	src/domain/work-orders/mappers/expand-scalar-board-ops.ts
2026-08-12 10:04:07 -03:00
Arthur Bassi
8a221c8819 fix(work-orders): consume board pendingUpliftCount for SH-188 gate
Map the authoritative board/search/detail pendingUpliftCount into the
Completed closability gate and align the pending-uplift tooltip with SH-188.
2026-08-12 09:55:34 -03:00
arthur.bassi
eadb0bda8b chore(work-orders): merge origin/dev into completedDate column branch 2026-08-12 09:35:54 -03:00
Arthur Bassi
4440f7d087 chore(work-orders): merge origin/dev into SH-109 inline save branch
EOF
2026-08-12 09:33:49 -03:00
arthur.bassi
64c485025b fix(work-orders): enforce single-service wizard create per SH-118
Use single service selection in the wizard and omit extraServices from board create.
2026-08-11 17:42:48 -03:00
arthur.bassi
8bfa600301 feat(work-orders): board wizard create with service notes
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-08-11 17:06:49 -03:00
Arthur Bassi
93c5a35b46 chore: merge origin/dev into slide-over media branch
Sync with latest dev (CompDoc/completedDate from PR #45) and resolve
conflicts while preserving slide-over detail, workOrderVersion on media
mutations, and the consolidated list page hook.
2026-08-11 16:46:32 -03:00
Arthur Bassi
ea747af854 fix(work-orders): isolate advanced filter facets from vendor collateral
Restack SH-121/SH-196 severity and uplift facets on current dev without unrelated Vendor screen changes, and cover public-interface apply plus search totalCount semantics.
2026-08-11 15:44:34 -03:00
arthur.bassi
99724f831c fix(work-orders): adapt Add-On indicator unstack onto independently approvable base
Extract inline schedule cell for the maintainability gate, drop completedDate
patch coverage that is not on WorkOrderTableRow on dev, and align range create
expectations with assignWizardScheduleFields.
2026-08-11 15:42:29 -03:00
arthur.bassi
94f07fb66f chore(work-orders): merge origin/dev into completedDate column branch
Align merge-base so vendor files matching dev drop out of the PR diff.
2026-08-11 15:31:57 -03:00
arthur.bassi
dd60b1d72e fix(work-orders): allow comp-doc generate without existing completion document
canGenerateCompDoc now ignores the completion-document closability gap so PM/Overdue drafts can enter generation.

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-08-11 15:28:00 -03:00
arthur.bassi
67c4ee8119 fix(work-orders): only block Completed on evidenced pending uplift
Absence of optional uplift fields means no pending, per SH-188.
2026-08-11 15:28:00 -03:00
arthur.bassi
a3e9a20477 fix(work-orders): fail closed on unknown uplift status 2026-08-11 15:28:00 -03:00
arthur.bassi
f6bc50dddd merge(dev): restack SH-196 uplift slice on latest dev 2026-08-11 15:27:57 -03:00
arthur.bassi
6b415f732c fix(work-orders): unify closability with sh-114 and pending uplift 2026-08-11 15:26:21 -03:00
arthur.bassi
f5414e4b14 feat(work-orders): block completed when uplift is pending 2026-08-11 15:26:21 -03:00
Arthur Bassi
1005186ea7 Merge branch 'dev' into feature/wo-detail-comp-doc 2026-08-11 15:23:55 -03:00
Arthur Bassi
8a2bc21845 fix(work-orders): sync addon-indicator with platform-polish parent
[recover] remove malicious eslint payload (was 692598b7)
2026-08-11 15:08:27 -03:00
Arthur Bassi
969f99a576 fix(work-orders): send workOrderVersion on media categorize/delete
Align CompDoc media mutations with backend PR #47 so categorize and
delete no longer return 422 WorkOrderVersionRequired.
2026-08-11 14:52:41 -03:00
Adam Moussa
4949508d43
Merge branch 'dev' into feat/sh-101-uplift-lifecycle 2026-08-11 13:35:55 -04:00
Arthur Bassi
f35fce9bd5
feat(work-orders): comment @mentions autocomplete (SH-217) (#91)
* docs(work-orders): add pending BE contract checklist for design parity gaps

* feat(work-orders): add mentions in work-order comments composer

* docs(work-orders): align pr description with jira and qa residuals

* refactor(workorders): split work order view page into view components

* fix(work-orders): export comment assignment vendor input types for view hook

* fix(work-orders): drop preferredContact from vendor update payload

Align with WorkOrderVendorUpdatePayload on current dev so the mentions branch typechecks.

* fix(work-orders): remove Preferred Contact from WO vendor editor (SH-180)

EOF

* fix(work-orders): harden comment mentions and clear draft on success

* fix(work-orders): harden mention highlight boundary and submit catch [SH-217]

* fix(work-orders): keep mention cursor sync on current value [SH-217]

* fix(work-orders): keep mention menu open after typing @

Pass live text into syncCursor instead of a render-time valueRef.
Add a composer interaction regression for @ autocomplete visibility.

Co-authored-by: Cursor <cursoragent@cursor.com>

---------

Co-authored-by: Cursor <cursoragent@cursor.com>
Co-authored-by: Alexandre Brandizzi <alex_brandizzi@hotmail.com>
2026-08-11 14:07:02 -03:00
arthur.bassi
5e3b7b8057 fix(work-orders): use authoritative type/doc/media for detail closability
Stop treating integration source as WorkOrderType.
Enrich detail from board detail for SH-114/SH-183 gates.

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-08-11 14:06:54 -03:00
arthur.bassi
4637f3ab14 chore: merge origin/dev into slide-over media branch
Sync with latest dev and add completedDate to the unscheduled highlight
fixture so the merge build stays type-safe.
2026-08-11 14:02:42 -03:00
Alexandre Brandizzi
b177987081
Merge branch 'dev' into feat/sh-101-uplift-lifecycle 2026-08-11 13:52:26 -03:00
Arthur Bassi
9c7b42e96b
feat(work-orders): SH-132 FE — Due Date distinct from Schedule On + Emergency calendar modal (#82)
* feat(work-orders): align Due Date and Past Due with SH-132 FE contract [SH-132]

* fix(work-orders): highlight Schedule On for unscheduled rows

Restore forceScheduleHighlight for Unscheduled section rows while keeping Due Date highlight for past-due and attempt feedback.

Co-authored-by: Cursor <cursoragent@cursor.com>

* test(work-orders): cover unscheduled Schedule On highlight [SH-132]

Add row-level public-interface regression proving Unscheduled rows force-highlight Schedule On, not Due Date (SH-165).

Co-authored-by: Cursor <cursoragent@cursor.com>

---------

Co-authored-by: Cursor <cursoragent@cursor.com>
Co-authored-by: Alexandre Brandizzi <alex_brandizzi@hotmail.com>
2026-08-11 13:49:41 -03:00
Alexandre Brandizzi
c0e203a090 feat(uplifts): complete SH-101 vendor workflow 2026-08-11 08:57:38 -03:00
arthur.bassi
8cd6d92ba7 fix(work-orders): map detail problem and source into closability
detailToClosabilityInput now uses WorkOrderDetail.problem as pm and source as WO type so Done is not permanently blocked by a false Service gap.

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-08-10 19:11:35 -03:00
arthur.bassi
d5fd6aa5d6 fix(work-orders): stop uplift column reading WO status; strip blank techs
mapUpliftSummary no longer treats row status as uplift primaryStatus, getUpliftCellLabel hides pills without hasUplift, and vendor submit filters blank new technicians.
2026-08-10 19:09:25 -03:00
arthur.bassi
55449a9e31 merge(work-orders): sync with platform-polish tip 2026-08-10 19:07:45 -03:00
arthur.bassi
c8a8522499 fix(work-orders): send wizard status and clear POC notes on site change
Map draft.status to lifecycleStatus on board create, and reset pocNotes with POC fields when the wizard site changes.

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-08-10 19:06:35 -03:00
arthur.bassi
e2a11926e0 fix(work-orders): use local calendar day for completedDate
Restore todayIso() after parent merge reintroduced UTC slice, and keep the wizard-date-utils regression test.

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-08-10 19:03:07 -03:00
Arthur Bassi
c850be2aeb fix(work-orders): compare completion labels via string helper
[recover] remove malicious eslint payload (was 19dfa0f9)
2026-08-10 17:12:14 -03:00
Arthur Bassi
2ed770bc79 fix(work-orders): separate Unscheduled header collapse and Add WO controls
[recover] remove malicious eslint payload (was ccec7322)
2026-08-10 17:12:13 -03:00
Arthur Bassi
2eb5359d82 fix(work-orders): address wizard create review findings
[recover] remove malicious eslint payload (was 166c63e4)
2026-08-10 17:12:13 -03:00
Arthur Bassi
d72be8c505 fix(work-orders): use local calendar day for slide-over completedDate
[recover] remove malicious eslint payload (was 6a278c01)
2026-08-10 17:12:13 -03:00
Arthur Bassi
cfb0e7ea45 fix(work-orders): persist additionalContacts on create and board PATCH [SH-218]
[recover] remove malicious eslint payload (was 3f372257)
2026-08-10 17:12:11 -03:00
Arthur Bassi
0ce63b9740 test(work-orders): cover completed date board read mapping
[recover] remove malicious eslint payload (was 0548bbb4)
2026-08-10 17:12:11 -03:00
Arthur Bassi
31c5559d23 fix(work-orders): clear uplift form state only after successful mutations
[recover] remove malicious eslint payload (was 380188af)
2026-08-10 17:12:10 -03:00
Arthur Bassi
ebc2e9a1e5 fix(work-orders): extract inline dialog state and enable Schedule On clear
[recover] remove malicious eslint payload (was 552c2daf)
2026-08-10 17:12:09 -03:00
arthur.bassi
7ea0d2c464 fix(work-orders): refresh CompDoc on Generate failure and drop EditWorkorder date helper
Invalidate board/location queries when Save Draft or Generate fails so partial
prerequisite writes stay authoritative, and remove the unused CompDoc
mapCompletedDateUpdateFormData EditWorkorder helper.
2026-08-04 16:27:59 -03:00
Alexandre Brandizzi
0027ecc41f Merge remote-tracking branch 'origin/dev' into feature/wo-detail-comp-doc 2026-08-04 10:30:37 -03:00
Alexandre Brandizzi
4b88a60751
fix(vendors): remove preferred contact and fix trade ordering (#63)
Some checks are pending
CI / ci (push) Waiting to run
CI / governance (push) Waiting to run
Deploy / deploy (push) Waiting to run
* fix(vendors): address SH-180 and SH-182

* refactor(vendors): satisfy maintainability gates
2026-08-03 17:53:39 -03:00
Alexandre Brandizzi
509b3c3212 fix(work-orders): persist completedDate via board and media sh-116
leave EditWorkorder for completedDate; await mutations before draft saved
toast; upload-then-categorize with MIME allowlist, progress, cancel, retry.
2026-07-31 12:24:31 -03:00
Arthur Bassi
27c7c8df55 test(work-orders): align table mutations test with updateCompletedDate
Assert updateCompletedDate instead of getById before EditWorkorder.
2026-07-31 09:58:34 -03:00
Arthur Bassi
96f3daf20c fix(work-orders): persist completedDate without legacy GetWorkorderById
Save Draft failed on GetWorkorderById (HTTP 400) before EditWorkorder.
Post only Id + CompletedDate and cover the EditWorkorder route contract.
2026-07-31 09:43:23 -03:00
Arthur Bassi
b2d44944ab fix(work-orders): resolve CompDoc/dev merge type and maintainability issues 2026-07-30 11:09:05 -03:00
Arthur Bassi
e3aa69e577 chore(work-orders): sync feature/wo-detail-comp-doc with current dev 2026-07-30 10:59:22 -03:00
Arthur Bassi
3004d039aa fix(work-orders): address SH-116 CompDoc review blockers
Gate CompDoc on selected service, use real pm titles only,
make Address editable via location update, and wire media
to the board API with categories instead of blob state.
2026-07-30 09:04:03 -03:00
Arthur Bassi
2d64c34898 fix(work-orders): extract docStatus mapper for governance ratchet
Keep work-order-mapper under the frozen line cap and cap addDispatchSignoff params.
2026-07-29 09:31:15 -03:00