mirror of
https://github.com/Sea-Haven-Industries/shoc-backend.git
synced 2026-10-07 16:19:07 +00:00
Map ordered commits and feature branch tips to the PR descriptions produced during staff review.
28 lines
1.3 KiB
Markdown
28 lines
1.3 KiB
Markdown
# PR bodies (copy-paste)
|
|
|
|
Full English PR descriptions are in the plan appendix and summarized below by branch tip.
|
|
|
|
| PR | Branch | Tip commit | Depends on |
|
|
|----|--------|------------|------------|
|
|
| 1 | `feat/work-orders-phase-4` | `cbcfd9a` Phase4 index shrink | existing Phase 4 PR |
|
|
| 2 | `feat/work-orders-completion-slideover-and-rollout` | `3e2952f` Phase6 idempotent (then stacked features) | Phase 6 base |
|
|
| 3 | `feature/wo-structured-service-notes` | `ecc1db3` | after F2+sites on slideover stack |
|
|
| 4 | `feature/wo-flag-color` | `62572d8` | after service notes |
|
|
| 5 | `feature/wo-board-search-paging` | `1eaf9b7` | after flag (or notes) |
|
|
| 6 | `feature/wo-comments-author-edit` | `16b31e5` | after search (controller mixed) |
|
|
| 7 | `feature/location-sites-vendor-contact` | `3983f76` | after F2 |
|
|
|
|
Stacked history on `feat/work-orders-completion-slideover-and-rollout` (`f61aff0`, ahead 7):
|
|
|
|
1. fix Phase6 migration
|
|
2. feat locations/sites + vendor contactName
|
|
3. feat structured service notes
|
|
4. feat flagColor
|
|
5. feat search/paging
|
|
6. feat comment edit / display names
|
|
7. docs staff review findings
|
|
|
|
Phase4 hardening lives only on `feat/work-orders-phase-4`.
|
|
|
|
Full PR markdown: see conversation / plan Apêndice B.
|
|
Staff findings: [staff-review-findings.md](../staff-review-findings.md)
|