Brings in merged PR #16 and vendor/Phase 1-4 work from origin/dev into the
Phase 5 (WeekRolled) head. Only conflict was ApplicationDbContextModelSnapshot.cs
(EF model snapshot touched by both sides); resolved by taking dev's latest
snapshot (matches migration 20260723220614) and grafting the
WorkOrderWeekRolledLedger entity + relationship blocks, matching the Phase5
migration Designer exactly. Migration ordering unchanged: Phase5 (20260709)
runs before vendor migrations (20260720-20260723).
Merge origin/dev (vendor roadmap PRs #28/#29, phases 1-3 PRs #13-15)
into work-orders-phase-4. Conflict in WorkOrderController.cs resolved by
keeping both the Phase 4 board/search endpoint and the dev-side XML doc
comment on GetDispatcherLookups (both additions at the same site).
Migration timestamps remain monotonic and non-overlapping. Phase 4 global
advanced search, search index migrations, and the cross-platform LocalDB
test guard are preserved alongside the merged vendor roadmap and phases 1-3.
Validation (Docker .NET 8 SDK): build 0 errors; 191 tests pass across
all three test projects (64 + 18 + 109).
Introduce in-process WeekRolled job with idempotent ledger to increment carriedOver for the SHOC board, plus optional PastDue cache and admin reprocess endpoints while keeping isPastDue derived on-read.
Harden contextual search on the weekly board and expose paginated cross-week GET /board/search with date presets, FE filter params, SQL indexes, and unit tests.
Document myWorkOrders overriding dispatchers, weekend dayGroup null contract, and that dispatcher lookups currently return all users. Map service ArgumentException to 400 for consistency.
Align board apptTime field locks with SyncFieldMergePolicy field names so sync cannot overwrite a manual appointment edit. Also add shared LifecycleStatusSets so the Phase 2 branch compiles.
Superseded by Phase0 (WorkOrderType as int) and Phase1 board indexes; keeping the bare Migration would either be skipped by EF or conflict if metadata were added.
Expose POST /api/workorders/board and POST /api/workorders/{id}/cancel for SHOC wizard/inline creation and soft cancel, with field locks, WO# normalization, and Admin-only hard delete.
Combine the reviewed Phase 1 read-only board endpoints with Phase 2 inline edit and optimistic concurrency, resolving shared foundation conflicts while preserving both feature sets.
Expand LifecycleStatus (EnRoute, OnSite, Rescheduled, Pending, PendingQuote) and WorkOrderType (Reactive, AddOn) to match the frontend prototype. Add FE label round-trip via LifecycleStatusMapper/WorkOrderTypeMapper, update derived fields, mutation rules and board unscheduled filter, and reactivate [Authorize] on WorkOrderController. Fix pre-existing dayGroup test expectation.
- GET /api/workorders/board with week window, Unscheduled section, and X of Y counts
- GET /api/workorders/lookups/dispatchers for SHOC filter avatars
- Board projection via WorkOrderBoardDataService with vendor/dispatch join and derived isPastDue
- Phase1_BoardIndexes migration (IX_workOrders_ScheduledDate)
- 5 board unit tests