- PROVISIONING-RUNBOOK.md: merged final state (6 checkers, dep-bump fixer, P5
intake-checker loop), SLACK_CHANNEL_ID, the gated P3-live flip steps (GitHub
App + agent-apply env + gated_build_verify_wiring), and D-1/D-2/D-7 marked
FIXED so the demo can use the live Slack answer path.
- P1-DEMO-SCRIPT.md: live Slack answer path now available (D-1 fixed); both the
Slack and operator-CLI answer paths documented for all four exit criteria.
- DEPLOY-AUDIT.md: D-1/D-2/D-7 RESOLVED (this PR); D-4/D-5 dep pinning and the
operator-CLI divergence kept as provisioning notes.
- OPERATOR-RUNBOOK.md (new): incident handling for pipeline stalls, parked tasks,
failed HITL resumes, budget exhaustion, transport outages, and
COMPLACENCY/COVERAGE alarms — each grounded in real run-team.py verbs, plus the
re-alarm-backoff -> Jira-after-N-nights escalation ladder (design §5/§6.6).