shoc-backend/SeaHaven.Services/Interfaces
Alexandre Brandizzi e5cf4cec09 merge: integrate origin/dev into PR #22 flag-color base
Brings in dev's Phase 5 (PR #17) + vendor PRs (#25/#28/#29) atop the
Phase 6/7 + flagColor base (PR #22). Preserves dev Phase 1-5 behavior and
PR #22 Phase 6/7 + flagColor behavior.

Conflict resolutions (16 files):
- Migrations Phase4_SearchIndexes/.Designer + Phase5_DomainEvents/.Designer:
  take dev (Phase4 incl. SQL Server SiteCode/InternalWONumber index-compat
  shrink fix; Phase5 identical). ModelSnapshot union: Vendor CompanyId index
  + Phase7 ServiceNotes/ExternalWorkOrderId index.
- ApplicationDbContext: keep dev SiteCode/InternalWONumber MaxLength (Phase1-5
  + unguarded model test) + HEAD CompletionDocTemplate/ExternalWorkOrderId.
- WorkOrderAuditService: unify on dev async staging API; convert Phase6
  CompletionService 2 call sites to await StageFieldChangedAsync (drops
  HEAD sync duplicate; only callers, no test refs).
- Hosted services: take HEAD (retry-on-failure, coherent with Phase7
  WorkOrderJobRunStateAccessor/OpsHealth). Program.cs keeps dev vendor DI
  (ClamAV/VendorDocumentScanWorker/ArgumentExceptionFilter) + HEAD Phase7.
- WorkOrderController: keep HEAD Phase6/7 service params + dev doc comment.
- VendorController/WorkOrderBoardCreateService/QueryFilters/appsettings:
  union / dev-correct.
- WorkOrderBoardUpdateServiceTests: union of HEAD (Phase6/7+flagColor) and
  dev (Phase1-5) test methods.

Verified WorkOrderType.Other (enum 99) is a legit category, not an overdue
sentinel; overdue uses dedicated OperationalFlags.PastDue + IsPastDue, and
'Overdue' is rejected as a WorkOrderType (no PR #23 import needed).

Removed dev duplicate Api.Options.WorkOrderJobRunState (HEAD defines it in
Services.Implementation alongside the Accessor; Services cannot reference Api).
2026-07-24 14:20:16 -03:00
..
IAccountService.cs refactor 2026-04-28 18:55:14 -05:00
IAssetService.cs refactor 2026-04-28 18:55:14 -05:00
IContactService.cs refactor 2026-04-28 18:55:14 -05:00
IDispatchService.cs refactor 2026-04-28 18:55:14 -05:00
IEmployeeService.cs refactor 2026-04-28 18:55:14 -05:00
IFollowUpService.cs refactor 2026-04-28 18:55:14 -05:00
ILocationService.cs feat(locations): add sites options endpoint and vendor contactName 2026-07-17 10:36:32 -03:00
IPastDueCacheService.cs feat(work-orders): add Phase 5 scheduled domain events (WeekRolled) 2026-07-24 10:13:17 -03:00
IPMScheduleService.cs refactor 2026-04-28 18:55:14 -05:00
ISyncFieldMergePolicy.cs fix(work-orders): address PR review on sync, audit, lock and mapper 2026-07-02 09:30:05 -03:00
IVendorService.cs feat(vendors): complete core vendor workflows 2026-07-23 17:02:40 -03:00
IWorkOrderAdvancedSearchService.cs feat(work-orders): add Phase 4 board search and advanced search API 2026-07-24 09:58:39 -03:00
IWorkOrderAuditService.cs feat(work-orders): add Phase 5 scheduled domain events (WeekRolled) 2026-07-24 10:13:17 -03:00
IWorkOrderBoardCancelService.cs feat(work-orders): add Phase 3 board create and soft cancel API 2026-07-08 10:17:31 -03:00
IWorkOrderBoardCreateService.cs feat(work-orders): add Phase 3 board create and soft cancel API 2026-07-08 10:17:31 -03:00
IWorkOrderBoardService.cs feat(work-orders): isolate phase 2 inline edit with optimistic concurrency 2026-07-07 11:26:13 -03:00
IWorkOrderBoardUpdateService.cs wip: work orders phases 1-7 (isolated from phase 0 foundation) 2026-06-30 10:09:48 -03:00
IWorkOrderCommentService.cs feat(work-orders): add Phase 6 slide-over detail comments audit and media API 2026-07-13 13:13:00 -03:00
IWorkOrderCompletionService.cs feat(work-orders): add Phase 6 slide-over detail comments audit and media API 2026-07-13 13:13:00 -03:00
IWorkOrderDetailService.cs feat(work-orders): add Phase 6 slide-over detail comments audit and media API 2026-07-13 13:13:00 -03:00
IWorkOrderFieldLockService.cs feat(work-orders): add audit, field lock and sync merge services 2026-07-02 09:17:59 -03:00
IWorkOrderMediaService.cs feat(work-orders): add Phase 6 slide-over detail comments audit and media API 2026-07-13 13:13:00 -03:00
IWorkOrderPhase7Services.cs feat(work-orders): add work order ingest API with X-Ingest-Key 2026-07-13 13:22:11 -03:00
IWorkOrderService.cs backend changes 2026-05-14 11:00:12 -05:00
IWorkOrderWeekRolledService.cs feat(work-orders): add Phase 5 scheduled domain events (WeekRolled) 2026-07-24 10:13:17 -03:00