shoc-backend/Api.SeaHavenIndustries/Controllers
Alexandre Brandizzi e5cf4cec09 merge: integrate origin/dev into PR #22 flag-color base
Brings in dev's Phase 5 (PR #17) + vendor PRs (#25/#28/#29) atop the
Phase 6/7 + flagColor base (PR #22). Preserves dev Phase 1-5 behavior and
PR #22 Phase 6/7 + flagColor behavior.

Conflict resolutions (16 files):
- Migrations Phase4_SearchIndexes/.Designer + Phase5_DomainEvents/.Designer:
  take dev (Phase4 incl. SQL Server SiteCode/InternalWONumber index-compat
  shrink fix; Phase5 identical). ModelSnapshot union: Vendor CompanyId index
  + Phase7 ServiceNotes/ExternalWorkOrderId index.
- ApplicationDbContext: keep dev SiteCode/InternalWONumber MaxLength (Phase1-5
  + unguarded model test) + HEAD CompletionDocTemplate/ExternalWorkOrderId.
- WorkOrderAuditService: unify on dev async staging API; convert Phase6
  CompletionService 2 call sites to await StageFieldChangedAsync (drops
  HEAD sync duplicate; only callers, no test refs).
- Hosted services: take HEAD (retry-on-failure, coherent with Phase7
  WorkOrderJobRunStateAccessor/OpsHealth). Program.cs keeps dev vendor DI
  (ClamAV/VendorDocumentScanWorker/ArgumentExceptionFilter) + HEAD Phase7.
- WorkOrderController: keep HEAD Phase6/7 service params + dev doc comment.
- VendorController/WorkOrderBoardCreateService/QueryFilters/appsettings:
  union / dev-correct.
- WorkOrderBoardUpdateServiceTests: union of HEAD (Phase6/7+flagColor) and
  dev (Phase1-5) test methods.

Verified WorkOrderType.Other (enum 99) is a legit category, not an overdue
sentinel; overdue uses dedicated OperationalFlags.PastDue + IsPastDue, and
'Overdue' is rejected as a WorkOrderType (no PR #23 import needed).

Removed dev duplicate Api.Options.WorkOrderJobRunState (HEAD defines it in
Services.Implementation alongside the Accessor; Services cannot reference Api).
2026-07-24 14:20:16 -03:00
..
AccountController.cs backend changes 2026-05-14 11:00:12 -05:00
AssetController.cs backend changes 2026-05-14 11:00:12 -05:00
AuthenticationController.cs fixes for Dev changes 2026-04-24 12:12:16 -05:00
CalendarController.cs Add calendar/events backend API (#8) 2026-06-22 18:46:46 -04:00
CommonController.cs Add null safety checks across all API controllers 2026-04-16 16:33:42 -04:00
ContactController.cs backend changes 2026-05-14 11:00:12 -05:00
DashboardController.cs Add DashboardController with Stats endpoint 2026-04-16 19:25:42 -04:00
DispatchController.cs backend architectural template 2026-05-06 10:49:33 -05:00
DispatchPublicController.cs Add vendor portal with token-based authentication 2026-04-20 12:01:53 -04:00
DropdownOptionsController.cs Add configurable dropdowns, new WO fields, and seed data 2026-04-17 10:40:38 -04:00
EmployeeController.cs backend changes 2026-05-14 11:00:12 -05:00
FollowUpController.cs backend changes 2026-05-14 11:00:12 -05:00
LocationController.cs feat(locations): add sites options endpoint and vendor contactName 2026-07-17 10:36:32 -03:00
PMScheduleController.cs backend changes 2026-05-14 11:00:12 -05:00
QuotesController.cs Fix pagination to use database-side Skip/Take instead of loading all rows 2026-04-16 16:54:18 -04:00
SettingsController.cs Fix pagination to use database-side Skip/Take instead of loading all rows 2026-04-16 16:54:18 -04:00
SyncController.cs feat(work-orders): add Sync kill-switch and ops health coexistence endpoints 2026-07-13 13:22:12 -03:00
TaskListTemplateController.cs Add Task List Templates with CRUD controller 2026-04-17 14:57:18 -04:00
UpliftController.cs Add NTE uplift workflow and vendor PO detail API 2026-04-20 13:25:56 -04:00
UserController.cs Add null safety checks across all API controllers 2026-04-16 16:33:42 -04:00
VendorController.cs merge: integrate origin/dev into PR #22 flag-color base 2026-07-24 14:20:16 -03:00
VendorOperationsController.cs feat(vendors): complete operations roadmap backend 2026-07-23 19:18:06 -03:00
VendorPortalController.cs fix(vendors): address roadmap review findings 2026-07-24 11:49:57 -03:00
WorkOrderController.cs merge: integrate origin/dev into PR #22 flag-color base 2026-07-24 14:20:16 -03:00
WorkOrderIngestController.cs feat(work-orders): add work order ingest API with X-Ingest-Key 2026-07-13 13:22:11 -03:00
WorkOrderJobsController.cs feat(work-orders): add Phase 5 scheduled domain events (WeekRolled) 2026-07-24 10:13:17 -03:00
WorkOrderOpsController.cs feat(work-orders): add Sync kill-switch and ops health coexistence endpoints 2026-07-13 13:22:12 -03:00