Commit graph

6 commits

Author SHA1 Message Date
Arthur Bassi
f4985378fc
feat(work-orders): add structured service notes POC and vendor fields (#21)
* fix(migrations): make Phase6 completion slide-over migration idempotent

Use IF EXISTS / IF COL_LENGTH guards and explicit EF migration metadata
so partial environments can apply Phase 6 safely.

* feat(locations): add sites options endpoint and vendor contactName

Expose GET /api/locations/sites for the WO create wizard and include
vendor contactName on dropdown responses.

* feat(work-orders): add structured service notes POC and vendor fields

Persist primary/extra services, service notes, free-text POC, and
tech/vendor notes on create/patch/board/detail instead of embedding
them in description.

* fix(work-orders): make stacked tip build for CI quality gates

* fix(work-orders): align stacked services with CI build

* fix(work-orders): keep FlagColor out of structured-notes slice

Remove FlagColor model/API/tests from this PR so schema and EF model stay aligned with the structured-fields migration. FlagColor remains in the follow-on PR that adds its migration.

---------

Co-authored-by: Arthur Bassi <arthur.winiarski.ranger@outlook.com>
2026-07-22 17:36:46 -03:00
Arthur Bassi
83272e4957 Revert "fix(work-orders): address PR #14 board PATCH review feedback"
This reverts commit eb64c2f55c.
2026-07-09 09:59:41 -03:00
Arthur Bassi
eb64c2f55c fix(work-orders): address PR #14 board PATCH review feedback
Reuse field-lock DB checks during staged audits, defer dispatch creation to the final save, and return 404 for missing work orders.
2026-07-09 09:54:53 -03:00
Arthur Bassi
673bc3b5a9 fix(work-orders): align phase 2 status/type contract to SHOC frontend
Expand LifecycleStatus (EnRoute, OnSite, Rescheduled, Pending, PendingQuote) and WorkOrderType (Reactive, AddOn) to match the frontend prototype. Add FE label round-trip via LifecycleStatusMapper/WorkOrderTypeMapper, update derived fields, mutation rules and board unscheduled filter, and reactivate [Authorize] on WorkOrderController. Fix pre-existing dayGroup test expectation.
2026-07-07 13:11:22 -03:00
Arthur Bassi
d040832b87 feat(work-orders): isolate phase 2 inline edit with optimistic concurrency
Deliver PATCH board field updates and drop phases 3-7 code from the branch while keeping phase 0/1 dependencies required to build and test.
2026-07-07 11:26:13 -03:00
Arthur Bassi
4f697f257a wip: work orders phases 1-7 (isolated from phase 0 foundation) 2026-06-30 10:09:48 -03:00