Commit graph

115 commits

Author SHA1 Message Date
Arthur Bassi
4b8a08fb10 fix(work-orders): block comment creation on canceled work orders 2026-08-24 09:59:13 -03:00
Arthur Bassi
f47264ec4d feat(work-orders): allow selective mutations on completed work orders
Permit flagColor, comments, and Extra media after completion while keeping Canceled fully locked.
2026-08-24 09:31:30 -03:00
Alexandre Brandizzi
518d856334 fix(vendors): enforce notes length limit 2026-08-20 18:17:48 -03:00
Arthur Bassi
c9c4d74194
Merge branch 'dev' into fix/sh-183-vendor-patch-new-dispatch 2026-08-20 15:28:16 -03:00
Arthur Bassi
14443aff18 fix(work-orders): audit and lock vendor when replacing an inactive primary
Creating a Pending dispatch now stages VendorId FieldChanged from the previous
assignment so field lock and concurrency checks run like a live vendor PATCH.
2026-08-20 15:09:34 -03:00
Arthur Bassi
af593fe2d2 fix(work-orders): create a new dispatch when patching vendor on an inactive primary
Cancelled, Canceled, and Refused primaries are not live company assignments.
VendorId PATCH now inserts a Pending dispatch instead of mutating the refused row.
2026-08-20 14:47:04 -03:00
Alexandre Brandizzi
d16afe3e0b fix(work-orders): enforce provisional WO numbers (SH-252) 2026-08-20 14:34:08 -03:00
Arthur Bassi
743841d93e fix(work-orders): map primary dispatch status on detail (SH-183) 2026-08-20 13:41:42 -03:00
Arthur Bassi
75d337df0f fix(work-orders): omit inactive primary vendor from board rows (SH-183)
Do not project VendorId/VendorName for Cancelled, Canceled, or Refused primary dispatches, and expose PrimaryDispatchStatus on the board DTO.
2026-08-20 13:22:12 -03:00
Alexandre Brandizzi
6fffc1b591
Merge branch 'dev' into feat/sh-254-be-confirm-deactivation 2026-08-20 10:58:23 -03:00
Alexandre Brandizzi
6c16ce7047 feat(vendors): record deactivations confirmed past open work orders
SH-44's user story is about not silently orphaning active work. The
confirmation dialog tells the operator, but nothing told the system, so
a deactivation that left work orders open was indistinguishable from one
that had none.

VendorService now takes an ILogger and writes a warning naming the
vendor, the user and the number of work orders left open whenever the
guard is cleared by confirmation. Both the update and delete paths are
covered; nothing is logged when there was nothing to leave open.
2026-08-19 13:48:30 -03:00
Alexandre Brandizzi
7a0856ddf7 feat(vendors): confirm-to-deactivate with open work orders (SH-254)
SH-44 and SH-82 both left "blocks, or requires explicit confirmation" to
be decided with the team, and the implementation took the blocking
branch. SH-254 settles it the other way: the approved design offers
"Deactivate anyway" beside the list of open work orders.

Deactivation with open work orders is now permitted, but only when the
caller says it has shown them: ConfirmOpenWorkOrders on the update DTO
and a confirmOpenWorkOrders query parameter on the delete route. Absent
the flag the existing guard still throws, so nothing deactivates by
accident and no caller loses the check by omission.

confirmOpenWorkOrders is a required parameter on DeleteVendorAsync
rather than an optional one, so every call site states its intent.
2026-08-19 13:31:16 -03:00
Alexandre Brandizzi
ec9b36ce29
Merge branch 'dev' into feat/sh-250-roster-additive-patch 2026-08-19 10:27:57 -03:00
arthur.bassi
2222d04fcb Merge remote-tracking branch 'origin/dev' into feature/sh-218-additional-contacts 2026-08-18 20:52:34 -03:00
Alexandre Brandizzi
33d0b2cebf
Merge branch 'dev' into feat/sh-250-roster-additive-patch 2026-08-18 17:46:41 -03:00
Alexandre Brandizzi
5386d6129d
Merge branch 'dev' into feature/sh-196-wo-uplifts 2026-08-18 17:46:38 -03:00
Alexandre Brandizzi
d843ac221d
Merge branch 'dev' into feature/sh-218-additional-contacts 2026-08-18 17:46:36 -03:00
arthur.bassi
8c44fa746e merge origin/feature/sh-196-wo-uplifts 2026-08-18 17:44:40 -03:00
Alexandre Brandizzi
2327097d5e fix(work-orders): symmetric NTE release, terminal guard, serialized cancel (SH-196)
Three contract gaps found reviewing the frontend consumer:

- Revoking an auto-approved uplift never restored the dispatch NTE. Create
  raises NTE for both auto-approved and approved requests, but revoke restored
  it only for Approved, so the allowance was freed while the NTE stayed raised
  and every create -> auto-approve -> revoke cycle compounded the inflation.
  Revoke now compensates for NoApprovalRequired symmetrically.
- Revoke and cancel had no work-order lifecycle check, so a direct API call
  could still mutate uplifts on a Completed or Canceled work order; the board
  dialog's read-only state is UX only. Both now reject terminal work orders in
  the service.
- WorkOrderBoardCancelService read the pending-uplift list outside any gate, so
  an in-flight create could commit after that read and leave a pending uplift on
  a Canceled work order. The cancel flow now runs inside the same per-work-order
  gate as create, so the pending read, withdrawal and status audit serialize
  against it.
2026-08-18 17:41:14 -03:00
arthur.bassi
5ea5a1d702 fix(work-orders): restore NTE on auto-approved revoke and serialize cancel 2026-08-18 17:39:11 -03:00
Alexandre Brandizzi
9ef2512e14 fix(vendor-roster): conflict on colliding rename, reject no-op company update (SH-250)
Two review findings on the additive PATCH path:

- AddTechniciansAsync can rename via CompanyFields.Name and write NormalizedName
  against the unique index, but the save had no guard. A colliding rename
  surfaced as an unhandled 500 from the PATCH action instead of a stable client
  conflict. Pre-check the normalized name against other live companies and throw
  VendorRosterDuplicateNameException, with a scoped catch around the save for the
  race where a competing rename commits in between. The controller maps it to a
  409 alongside the existing concurrency conflict.
- Empty-payload validation only rejected a null CompanyFields, so an all-blank
  CompanyFields object was forwarded as a company update, bumping RowVersion and
  rewriting every technician's LastModificationTime without changing any company
  data. Blank fields now collapse to no company change, and a request with
  neither technicians nor a real company value fails validation.
2026-08-18 17:33:16 -03:00
Alexandre Brandizzi
11a355bb7a feat(vendor-roster): additive PATCH endpoint for technician adds (SH-250, SH-246)
PATCH /api/vendor-company-roster/{companyId} inserts the submitted
technicians and optionally updates company fields. Technicians absent
from the payload are never removed or deactivated, so the Add Vendor
flow can no longer soft-delete an existing roster via the full-snapshot
PUT. Stale rowVersion still 409s; unknown company 404s. POST (create)
and PUT (reconcile) behaviour is unchanged.
2026-08-18 12:14:12 -03:00
Alexandre Brandizzi
577b7add31 feat(vendors): server-owned canonical trades vocabulary for SH-249 2026-08-18 12:11:13 -03:00
Arthur Bassi
92a3b3f045 chore(work-orders): merge origin/dev into SH-218 additional contacts
Keep IsAddOn create tests from dev alongside additional-contacts coverage.
2026-08-18 11:53:26 -03:00
arthur.bassi
aeface594a fix(work-orders): serialize uplift create and atomic cancel (SH-196) 2026-08-18 10:20:05 -03:00
Arthur Bassi
3609365939 fix(work-orders): map additionalContacts on detail GET (SH-218)
Copy contacts into MapInfo so slide-over round-trips create/PATCH, and require name plus phone on retained entries while dropping blank placeholders.
2026-08-18 10:03:12 -03:00
Arthur Bassi
4760f3fdd7 fix(work-orders): name Schedule On in PastDueStatusBlocked and register SH-121 no-op
The 422 still told dispatchers to update Due Date. Point the remedy at Schedule On and make the SH-121 successor visible to EF so G6 lineage is complete.
2026-08-18 09:19:27 -03:00
Arthur Bassi
c9a80f5c79 fix(work-orders): restore SH-185 Schedule On Past Due and assert IsAddOn audit
Past Due follows ScheduledDate so Due Date alone cannot set or clear it. Auto-schedule and reschedule tests now expect the third IsAddOn audit field.
2026-08-17 10:36:03 -03:00
Arthur Bassi
fa05b22df6 chore(work-orders): merge SH-121 facets and keep SH-184 IsAddOn migration 2026-08-17 10:28:03 -03:00
arthur.bassi
4c15669aff fix(work-orders): enforce SH-196 cumulative allowance and one pending per WO
Auto-approval now uses the WO-scoped $500/$5,000 Emergency cap instead of dispatch NTE, rejects a second open request across dispatches, and cancelling a WO withdraws pending uplifts with audit.
2026-08-14 10:36:35 -03:00
Arthur Bassi
17c2e968cd feat(work-orders): board search facets for SH-121/SH-196 2026-08-13 16:34:21 -03:00
Arthur Bassi
36ef0b00f5 feat(work-orders): persist additionalContacts on create, board GET and PATCH (SH-218)
Add JSON column, DTO/mapper, create + PATCH field, board projection, FluentValidation,
and regression tests for additional POC contacts round-trip.
2026-08-13 16:11:36 -03:00
arthur.bassi
b81cfbb005 feat(work-orders): WO-scoped uplift endpoints and board summary (SH-196)
Expose workorders/{id}/uplifts list/create/cancel/revoke for the SH-196 dialog, aggregate upliftSummary on board rows, and add service/controller regression tests.
2026-08-13 14:49:56 -03:00
Arthur Bassi
97e042f552 feat(work-orders): persist IsAddOn frozen at create (SH-126)
Add set-once IsAddOn with server cutoff at create, board DTO exposure, legacy type-7 backfill, and Types=AddOn search compat. Aligns with FE PR #61 frozen contract.
2026-08-13 13:30:09 -03:00
Arthur Bassi
05dd262e80 fix(work-orders): derive Past Due from DueDate instead of ScheduledDate
Past Due must track the deadline (Due Date), not Schedule On. Keep dueDate and scheduledDate PATCH mutations independent so rescheduling alone does not clear Past Due.
2026-08-13 13:28:25 -03:00
Arthur Bassi
29dec00790 fix(work-orders): keep pendingUpliftCount on detail and exclude deleted dispatches
Map board PendingUpliftCount through WorkOrderDetailService.MapInfo and ignore soft-deleted dispatches in the aggregate so SH-188 gating is authoritative for board/search/detail.
2026-08-12 11:50:56 -03:00
Arthur Bassi
aaeeb90f1a feat(work-orders): expose pendingUpliftCount on board rows (SH-188)
Aggregate Pending uplift requests across all dispatches tied to a work
order so the board/search/detail contract can drive the Completed gate.
2026-08-12 09:43:10 -03:00
Arthur Bassi
afcb4fde8d Merge branch 'dev' into feature/wo-board-completed-date-media 2026-08-11 15:20:17 -03:00
Arthur Bassi
de0f6da8fb fix(work-orders): scope legacy GET GetComments by account [SH-221]
Pass ClaimsPrincipal into GetCommentsAsync and filter via
GetAllForAccountAsync so account-scoped callers cannot enumerate
cross-tenant comments. ADR + cross-account tests updated.
2026-08-11 15:18:29 -03:00
Arthur Bassi
3c090e2757 fix(work-orders): scope comments and completion-doc by account [SH-221]
Close the remaining SH-221 bypass: board/legacy comments and completion-doc now enforce server-derived account scope, authorize before blob storage, and cover cross-account regressions.
2026-08-11 14:52:02 -03:00
Arthur Bassi
62a4828e2f fix(work-orders): scope legacy list/detail GETs by account [SH-221]
Close the remaining SH-221 read gap so Getworkorders, filtered lists, and GetWorkorderById enforce the same server-derived account boundary as board/media.

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-08-11 11:57:37 -03:00
Arthur Bassi
1edcf479ae fix(work-orders): apply account scope across create and reads [SH-221]
Stamp WorkOrder.AccountId on all create paths and filter board/list/search/detail by server-derived account claims so scoped callers cannot cross accounts.

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-08-11 10:45:37 -03:00
Arthur Bassi
446e43b2c6 !fix(users): restrict DeleteUser to Admin [SH-221]
Align DeleteUser with AddUser/EditUser: Admin role at controller and
service entry, Forbidden for non-Admin, and regression coverage.

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-08-11 09:44:52 -03:00
Arthur Bassi
d0724a0ac5 !fix(users): restrict AccountId assignment to Admin [SH-221]
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-08-11 09:28:08 -03:00
Alexandre Brandizzi
24283b320a feat(uplifts): complete SH-101 approval lifecycle 2026-08-11 08:58:19 -03:00
Alexandre Brandizzi
5dcd68b0a1 fix(vendor-portal): block uplift approval after refusal 2026-08-10 13:22:16 -03:00
Alexandre Brandizzi
7dabd25155 feat(vendor-portal): add refusal lifecycle (SH-98) 2026-08-10 13:00:32 -03:00
Arthur Bassi
ea2dedf579 !fix(work-orders): fail-closed media account scope with org_scope claim [SH-221] 2026-08-06 10:26:04 -03:00
Arthur Bassi
fdc315d8fe !feat(work-orders): enforce media account scope and AddMedia freshness [SH-221] 2026-08-06 09:47:34 -03:00
Arthur Bassi
8ff4ab1742 fix(work-orders): document single-org media scope (ADR 0001)
Clarify SH-116 tenant scope as board-aligned ApplyBaseScope + claims, and add out-of-org-scope GET/mutation tests for deleted/template/missing WOs.
2026-08-04 16:07:26 -03:00