Commit graph

11 commits

Author SHA1 Message Date
Arthur Bassi
88caede86a fix(work-orders): address PR #14 board PATCH review feedback
Reuse field-lock DB checks during staged audits, defer dispatch creation to the final save, and return 404 for missing work orders.
2026-07-09 09:58:41 -03:00
Arthur Bassi
91122d753d merge: integrate Phase 1 board API into Phase 2 branch
Combine the reviewed Phase 1 read-only board endpoints with Phase 2 inline edit and optimistic concurrency, resolving shared foundation conflicts while preserving both feature sets.
2026-07-07 13:59:22 -03:00
Arthur Bassi
673bc3b5a9 fix(work-orders): align phase 2 status/type contract to SHOC frontend
Expand LifecycleStatus (EnRoute, OnSite, Rescheduled, Pending, PendingQuote) and WorkOrderType (Reactive, AddOn) to match the frontend prototype. Add FE label round-trip via LifecycleStatusMapper/WorkOrderTypeMapper, update derived fields, mutation rules and board unscheduled filter, and reactivate [Authorize] on WorkOrderController. Fix pre-existing dayGroup test expectation.
2026-07-07 13:11:22 -03:00
Arthur Bassi
d040832b87 feat(work-orders): isolate phase 2 inline edit with optimistic concurrency
Deliver PATCH board field updates and drop phases 3-7 code from the branch while keeping phase 0/1 dependencies required to build and test.
2026-07-07 11:26:13 -03:00
Arthur Bassi
ff53cb9fa6 feat(work-orders): add weekly board read API (Phase 1)
- GET /api/workorders/board with week window, Unscheduled section, and X of Y counts
- GET /api/workorders/lookups/dispatchers for SHOC filter avatars
- Board projection via WorkOrderBoardDataService with vendor/dispatch join and derived isPastDue
- Phase1_BoardIndexes migration (IX_workOrders_ScheduledDate)
- 5 board unit tests
2026-07-07 10:10:06 -03:00
Arthur Bassi
e5902e1df3 fix(work-orders): address PR review on sync, audit, lock and mapper 2026-07-02 09:30:05 -03:00
Arthur Bassi
76e839addf test(work-orders): cover FE-aligned mappers and derived field logic 2026-07-02 09:19:28 -03:00
Arthur Bassi
623810da45 feat(phase-0): finalize foundation — authorize, concurrency filter, isolated build 2026-07-02 09:19:28 -03:00
Arthur Bassi
7a81b6d279 test(work-orders): add Phase 0 domain unit tests 2026-07-02 09:19:28 -03:00
Arthur Bassi
4f697f257a wip: work orders phases 1-7 (isolated from phase 0 foundation) 2026-06-30 10:09:48 -03:00
Arthur Bassi
5d5b3234c4 test(work-orders): add Phase 0 domain unit tests 2026-06-29 17:22:31 -03:00