Commit graph

36 commits

Author SHA1 Message Date
Alexandre Brandizzi
27bf81b7f8 fix(work-orders): address procurement review findings 2026-07-27 14:40:17 -03:00
Alexandre Brandizzi
e3c37e54b4 feat: complete SH-133 procurement reconciliation 2026-07-24 22:13:25 -03:00
Arthur Bassi
620a36af54
feat(work-orders): enrich board search overdue filters and 0-based paging (#23)
* feat(work-orders): enrich board search overdue filters and 0-based paging

* fix(work-orders): align stacked services with CI build

* fix(tests): pass userDataService in comment service unit test

* fix(work-orders): use dedicated overdue query flag

Stop treating WorkOrderType.Other as an overdue sentinel. Board and advanced search now accept overdue=true while types=Other filters real Other rows; combining both uses OR.

* test(work-orders): cover overdue date/status boundary and Other type-filter

Lock the PR #23 overdue regression boundary through the public advanced
search service. Prove overdue filtering is driven by past-due date plus
non-terminal status, not by the WorkOrderType.Other sentinel:
- Other + future/not-completed excluded from overdue
- past-due + Scheduled included; past-due + Completed/Canceled excluded
- types=[PM, Other] keeps real Other rows and does not pull past-due rows
- assert 0-based paging (Page=0) is preserved alongside overdue/type filters

---------

Co-authored-by: Arthur Bassi <arthur.winiarski.ranger@outlook.com>
Co-authored-by: Alexandre Brandizzi <alex_brandizzi@hotmail.com>
2026-07-24 21:12:03 +00:00
Alexandre Brandizzi
e5cf4cec09 merge: integrate origin/dev into PR #22 flag-color base
Brings in dev's Phase 5 (PR #17) + vendor PRs (#25/#28/#29) atop the
Phase 6/7 + flagColor base (PR #22). Preserves dev Phase 1-5 behavior and
PR #22 Phase 6/7 + flagColor behavior.

Conflict resolutions (16 files):
- Migrations Phase4_SearchIndexes/.Designer + Phase5_DomainEvents/.Designer:
  take dev (Phase4 incl. SQL Server SiteCode/InternalWONumber index-compat
  shrink fix; Phase5 identical). ModelSnapshot union: Vendor CompanyId index
  + Phase7 ServiceNotes/ExternalWorkOrderId index.
- ApplicationDbContext: keep dev SiteCode/InternalWONumber MaxLength (Phase1-5
  + unguarded model test) + HEAD CompletionDocTemplate/ExternalWorkOrderId.
- WorkOrderAuditService: unify on dev async staging API; convert Phase6
  CompletionService 2 call sites to await StageFieldChangedAsync (drops
  HEAD sync duplicate; only callers, no test refs).
- Hosted services: take HEAD (retry-on-failure, coherent with Phase7
  WorkOrderJobRunStateAccessor/OpsHealth). Program.cs keeps dev vendor DI
  (ClamAV/VendorDocumentScanWorker/ArgumentExceptionFilter) + HEAD Phase7.
- WorkOrderController: keep HEAD Phase6/7 service params + dev doc comment.
- VendorController/WorkOrderBoardCreateService/QueryFilters/appsettings:
  union / dev-correct.
- WorkOrderBoardUpdateServiceTests: union of HEAD (Phase6/7+flagColor) and
  dev (Phase1-5) test methods.

Verified WorkOrderType.Other (enum 99) is a legit category, not an overdue
sentinel; overdue uses dedicated OperationalFlags.PastDue + IsPastDue, and
'Overdue' is rejected as a WorkOrderType (no PR #23 import needed).

Removed dev duplicate Api.Options.WorkOrderJobRunState (HEAD defines it in
Services.Implementation alongside the Accessor; Services cannot reference Api).
2026-07-24 14:20:16 -03:00
Alexandre Brandizzi
a9dee0bb84 merge: integrate origin/dev into work-orders-phase-4
Merge origin/dev (vendor roadmap PRs #28/#29, phases 1-3 PRs #13-15)
into work-orders-phase-4. Conflict in WorkOrderController.cs resolved by
keeping both the Phase 4 board/search endpoint and the dev-side XML doc
comment on GetDispatcherLookups (both additions at the same site).

Migration timestamps remain monotonic and non-overlapping. Phase 4 global
advanced search, search index migrations, and the cross-platform LocalDB
test guard are preserved alongside the merged vendor roadmap and phases 1-3.

Validation (Docker .NET 8 SDK): build 0 errors; 191 tests pass across
all three test projects (64 + 18 + 109).
2026-07-24 13:38:20 -03:00
Alexandre Brandizzi
8192da7790
Merge pull request #15 from Sea-Haven-Industries/feat/work-orders-phase-3
Feat/work orders Phase 3 board create and soft cancel
2026-07-24 13:34:39 -03:00
Alexandre Brandizzi
df828cf48c
Merge pull request #14 from Sea-Haven-Industries/feat/work-orders-phase-2
Feat/work orders phase 2
2026-07-24 13:32:25 -03:00
Alexandre Brandizzi
3bd0268129
Merge pull request #13 from Sea-Haven-Industries/feat/work-orders-phase-1-board
Feat/work orders phase 1 board
2026-07-24 13:29:09 -03:00
Arthur Bassi
11fed06f03 feat(work-orders): add Phase 4 board search and advanced search API
Harden contextual search on the weekly board and expose paginated cross-week GET /board/search with date presets, FE filter params, SQL indexes, and unit tests.
2026-07-24 09:58:39 -03:00
Alexandre Brandizzi
8cf49afc2c feat(vendors): complete core vendor workflows 2026-07-23 17:02:40 -03:00
Arthur Bassi
385812c5c3 merge: sync phase 3 with updated phase 2 base
Reconcile migration/docs deletions from phase 2, adopt async audit staging and ApptTime lock contracts, and keep phase 3 create/cancel transactional behavior.
2026-07-23 13:28:54 -03:00
Arthur Bassi
cc37a0283b fix(work-orders): keep FlagColor feature on this slice with its migration
Restore FlagColor model/API/tests here after the parent structured-notes PR dropped them, so this PR remains the coherent home for the FlagColor column and palette.
2026-07-21 09:42:10 -03:00
Arthur Bassi
40d86c85a1 merge: bring FlagColor branch onto structured-notes without FlagColor model 2026-07-21 09:40:55 -03:00
Arthur Bassi
33574c233b fix(work-orders): keep FlagColor out of structured-notes slice
Remove FlagColor model/API/tests from this PR so schema and EF model stay aligned with the structured-fields migration. FlagColor remains in the follow-on PR that adds its migration.
2026-07-21 09:38:34 -03:00
Arthur Bassi
61b4c84337 fix(work-orders): lock ScheduledStart/End when patching apptTime
Align board apptTime field locks with SyncFieldMergePolicy field names so sync cannot overwrite a manual appointment edit. Also add shared LifecycleStatusSets so the Phase 2 branch compiles.
2026-07-21 09:31:27 -03:00
Arthur Bassi
76db2b5a37 fix(work-orders): address PR14 phase-2 review feedback 2026-07-17 14:48:48 -03:00
Arthur Bassi
4bd11dcf6b fix(work-orders): address stacked PR review feedback 2026-07-17 14:31:08 -03:00
Arthur Bassi
fa1eca8f89 fix(work-orders): make stacked tip build for CI quality gates 2026-07-17 13:18:46 -03:00
Arthur Bassi
a80a71b16a fix(work-orders): make stacked tip build for CI quality gates 2026-07-17 13:18:43 -03:00
Arthur Bassi
62572d8e03 feat(work-orders): add board flagColor with fixed palette
Support PATCH flagColor with FE-aligned #RRGGBB palette and expose the
value on board/detail rows.
2026-07-17 10:37:24 -03:00
Arthur Bassi
ecc1db3726 feat(work-orders): add structured service notes POC and vendor fields
Persist primary/extra services, service notes, free-text POC, and
tech/vendor notes on create/patch/board/detail instead of embedding
them in description.
2026-07-17 10:37:23 -03:00
Arthur Bassi
1074ed860b feat(work-orders): add work order ingest API with X-Ingest-Key 2026-07-13 13:22:11 -03:00
Arthur Bassi
af84001bf1 feat(work-orders): add Phase 6 slide-over detail comments audit and media API 2026-07-13 13:13:00 -03:00
Arthur Bassi
88f9245fbf merge: sync Phase 1 board review fixes into Phase 2
Resolve conflicts in WorkOrderController and WorkOrderBoardService so Phase 2 merges cleanly into the Phase 1 base.
2026-07-10 10:41:36 -03:00
Arthur Bassi
c2d0bd45e3 fix(work-orders): address PR #13 review feedback
Return BadRequest for invalid board week window, remove duplicate unused board types, fix POC null guard, and document appt precedence and UTC Phase 1 assumptions.
2026-07-09 10:06:36 -03:00
Arthur Bassi
4617e8ba83 feat(work-orders): add Phase 4 board search and advanced search API
Harden contextual search on the weekly board and expose paginated cross-week GET /board/search with date presets, FE filter params, SQL indexes, and unit tests.
2026-07-08 14:58:59 -03:00
Arthur Bassi
e5bda0714a feat(work-orders): add Phase 3 board create and soft cancel API
Expose POST /api/workorders/board and POST /api/workorders/{id}/cancel for SHOC wizard/inline creation and soft cancel, with field locks, WO# normalization, and Admin-only hard delete.
2026-07-08 10:17:31 -03:00
Arthur Bassi
91122d753d merge: integrate Phase 1 board API into Phase 2 branch
Combine the reviewed Phase 1 read-only board endpoints with Phase 2 inline edit and optimistic concurrency, resolving shared foundation conflicts while preserving both feature sets.
2026-07-07 13:59:22 -03:00
Arthur Bassi
673bc3b5a9 fix(work-orders): align phase 2 status/type contract to SHOC frontend
Expand LifecycleStatus (EnRoute, OnSite, Rescheduled, Pending, PendingQuote) and WorkOrderType (Reactive, AddOn) to match the frontend prototype. Add FE label round-trip via LifecycleStatusMapper/WorkOrderTypeMapper, update derived fields, mutation rules and board unscheduled filter, and reactivate [Authorize] on WorkOrderController. Fix pre-existing dayGroup test expectation.
2026-07-07 13:11:22 -03:00
Arthur Bassi
d040832b87 feat(work-orders): isolate phase 2 inline edit with optimistic concurrency
Deliver PATCH board field updates and drop phases 3-7 code from the branch while keeping phase 0/1 dependencies required to build and test.
2026-07-07 11:26:13 -03:00
Arthur Bassi
ff53cb9fa6 feat(work-orders): add weekly board read API (Phase 1)
- GET /api/workorders/board with week window, Unscheduled section, and X of Y counts
- GET /api/workorders/lookups/dispatchers for SHOC filter avatars
- Board projection via WorkOrderBoardDataService with vendor/dispatch join and derived isPastDue
- Phase1_BoardIndexes migration (IX_workOrders_ScheduledDate)
- 5 board unit tests
2026-07-07 10:10:06 -03:00
Arthur Bassi
e5902e1df3 fix(work-orders): address PR review on sync, audit, lock and mapper 2026-07-02 09:30:05 -03:00
Arthur Bassi
187d935da2 feat(work-orders): add lifecycle, type mappers and derived field rules 2026-07-02 09:19:28 -03:00
Arthur Bassi
49e5de5152 feat(work-orders): add audit, field lock and sync merge services 2026-07-02 09:17:59 -03:00
Arthur Bassi
4f697f257a wip: work orders phases 1-7 (isolated from phase 0 foundation) 2026-06-30 10:09:48 -03:00
Arthur Bassi
f52c430c2c feat(work-orders): add audit, field lock and sync merge services 2026-06-29 17:22:31 -03:00