Commit graph

22 commits

Author SHA1 Message Date
Alexandre Brandizzi
a9dee0bb84 merge: integrate origin/dev into work-orders-phase-4
Merge origin/dev (vendor roadmap PRs #28/#29, phases 1-3 PRs #13-15)
into work-orders-phase-4. Conflict in WorkOrderController.cs resolved by
keeping both the Phase 4 board/search endpoint and the dev-side XML doc
comment on GetDispatcherLookups (both additions at the same site).

Migration timestamps remain monotonic and non-overlapping. Phase 4 global
advanced search, search index migrations, and the cross-platform LocalDB
test guard are preserved alongside the merged vendor roadmap and phases 1-3.

Validation (Docker .NET 8 SDK): build 0 errors; 191 tests pass across
all three test projects (64 + 18 + 109).
2026-07-24 13:38:20 -03:00
Alexandre Brandizzi
df828cf48c
Merge pull request #14 from Sea-Haven-Industries/feat/work-orders-phase-2
Feat/work orders phase 2
2026-07-24 13:32:25 -03:00
Alexandre Brandizzi
3bd0268129
Merge pull request #13 from Sea-Haven-Industries/feat/work-orders-phase-1-board
Feat/work orders phase 1 board
2026-07-24 13:29:09 -03:00
Arthur Bassi
11fed06f03 feat(work-orders): add Phase 4 board search and advanced search API
Harden contextual search on the weekly board and expose paginated cross-week GET /board/search with date presets, FE filter params, SQL indexes, and unit tests.
2026-07-24 09:58:39 -03:00
Alexandre Brandizzi
5b4b538c16 fix(vendors): preserve company and phone integrity 2026-07-23 19:17:14 -03:00
Alexandre Brandizzi
8cf49afc2c feat(vendors): complete core vendor workflows 2026-07-23 17:02:40 -03:00
Arthur Bassi
385812c5c3 merge: sync phase 3 with updated phase 2 base
Reconcile migration/docs deletions from phase 2, adopt async audit staging and ApptTime lock contracts, and keep phase 3 create/cancel transactional behavior.
2026-07-23 13:28:54 -03:00
Alexandre Brandizzi
1162c68596
feat(vendors): add directory filters and details API (#25)
* feat(vendors): add directory filters and details API

* fix(vendors): preserve omitted status

* fix(vendors): align facet filtering

* fix(vendors): address directory review findings
2026-07-23 15:55:47 +00:00
Arthur Bassi
75969a1e3d docs(work-orders): clarify board filter precedence and dispatcher lookup
Document myWorkOrders overriding dispatchers, weekend dayGroup null contract, and that dispatcher lookups currently return all users. Map service ArgumentException to 400 for consistency.
2026-07-21 09:33:24 -03:00
Arthur Bassi
f3d2a5cfe7 fix(work-orders): address PR13 phase-1 review feedback 2026-07-17 14:51:56 -03:00
Arthur Bassi
4bd11dcf6b fix(work-orders): address stacked PR review feedback 2026-07-17 14:31:08 -03:00
Arthur Bassi
88f9245fbf merge: sync Phase 1 board review fixes into Phase 2
Resolve conflicts in WorkOrderController and WorkOrderBoardService so Phase 2 merges cleanly into the Phase 1 base.
2026-07-10 10:41:36 -03:00
Arthur Bassi
c2d0bd45e3 fix(work-orders): address PR #13 review feedback
Return BadRequest for invalid board week window, remove duplicate unused board types, fix POC null guard, and document appt precedence and UTC Phase 1 assumptions.
2026-07-09 10:06:36 -03:00
Arthur Bassi
91122d753d merge: integrate Phase 1 board API into Phase 2 branch
Combine the reviewed Phase 1 read-only board endpoints with Phase 2 inline edit and optimistic concurrency, resolving shared foundation conflicts while preserving both feature sets.
2026-07-07 13:59:22 -03:00
Arthur Bassi
673bc3b5a9 fix(work-orders): align phase 2 status/type contract to SHOC frontend
Expand LifecycleStatus (EnRoute, OnSite, Rescheduled, Pending, PendingQuote) and WorkOrderType (Reactive, AddOn) to match the frontend prototype. Add FE label round-trip via LifecycleStatusMapper/WorkOrderTypeMapper, update derived fields, mutation rules and board unscheduled filter, and reactivate [Authorize] on WorkOrderController. Fix pre-existing dayGroup test expectation.
2026-07-07 13:11:22 -03:00
Arthur Bassi
d040832b87 feat(work-orders): isolate phase 2 inline edit with optimistic concurrency
Deliver PATCH board field updates and drop phases 3-7 code from the branch while keeping phase 0/1 dependencies required to build and test.
2026-07-07 11:26:13 -03:00
Arthur Bassi
8efe4460bb fix(work-orders): complete Phase 1 board indexes, Service DTO and helper wiring
Add AssignTo+ScheduledDate and WorkOrderType indexes, expose service on board rows, and route data access through shared projection/filter helpers.
2026-07-07 10:11:04 -03:00
Arthur Bassi
ff53cb9fa6 feat(work-orders): add weekly board read API (Phase 1)
- GET /api/workorders/board with week window, Unscheduled section, and X of Y counts
- GET /api/workorders/lookups/dispatchers for SHOC filter avatars
- Board projection via WorkOrderBoardDataService with vendor/dispatch join and derived isPastDue
- Phase1_BoardIndexes migration (IX_workOrders_ScheduledDate)
- 5 board unit tests
2026-07-07 10:10:06 -03:00
Arthur Bassi
4f697f257a wip: work orders phases 1-7 (isolated from phase 0 foundation) 2026-06-30 10:09:48 -03:00
npalOmega
59385cf5b1 backend changes 2026-05-14 11:00:12 -05:00
npalOmega
5e4d9894e9 backend architectural template 2026-05-06 10:49:33 -05:00
npalOmega
ac76b201de refactor 2026-04-28 18:55:14 -05:00