Commit graph

13 commits

Author SHA1 Message Date
Alexandre Brandizzi
e5cf4cec09 merge: integrate origin/dev into PR #22 flag-color base
Brings in dev's Phase 5 (PR #17) + vendor PRs (#25/#28/#29) atop the
Phase 6/7 + flagColor base (PR #22). Preserves dev Phase 1-5 behavior and
PR #22 Phase 6/7 + flagColor behavior.

Conflict resolutions (16 files):
- Migrations Phase4_SearchIndexes/.Designer + Phase5_DomainEvents/.Designer:
  take dev (Phase4 incl. SQL Server SiteCode/InternalWONumber index-compat
  shrink fix; Phase5 identical). ModelSnapshot union: Vendor CompanyId index
  + Phase7 ServiceNotes/ExternalWorkOrderId index.
- ApplicationDbContext: keep dev SiteCode/InternalWONumber MaxLength (Phase1-5
  + unguarded model test) + HEAD CompletionDocTemplate/ExternalWorkOrderId.
- WorkOrderAuditService: unify on dev async staging API; convert Phase6
  CompletionService 2 call sites to await StageFieldChangedAsync (drops
  HEAD sync duplicate; only callers, no test refs).
- Hosted services: take HEAD (retry-on-failure, coherent with Phase7
  WorkOrderJobRunStateAccessor/OpsHealth). Program.cs keeps dev vendor DI
  (ClamAV/VendorDocumentScanWorker/ArgumentExceptionFilter) + HEAD Phase7.
- WorkOrderController: keep HEAD Phase6/7 service params + dev doc comment.
- VendorController/WorkOrderBoardCreateService/QueryFilters/appsettings:
  union / dev-correct.
- WorkOrderBoardUpdateServiceTests: union of HEAD (Phase6/7+flagColor) and
  dev (Phase1-5) test methods.

Verified WorkOrderType.Other (enum 99) is a legit category, not an overdue
sentinel; overdue uses dedicated OperationalFlags.PastDue + IsPastDue, and
'Overdue' is rejected as a WorkOrderType (no PR #23 import needed).

Removed dev duplicate Api.Options.WorkOrderJobRunState (HEAD defines it in
Services.Implementation alongside the Accessor; Services cannot reference Api).
2026-07-24 14:20:16 -03:00
Alexandre Brandizzi
a9dee0bb84 merge: integrate origin/dev into work-orders-phase-4
Merge origin/dev (vendor roadmap PRs #28/#29, phases 1-3 PRs #13-15)
into work-orders-phase-4. Conflict in WorkOrderController.cs resolved by
keeping both the Phase 4 board/search endpoint and the dev-side XML doc
comment on GetDispatcherLookups (both additions at the same site).

Migration timestamps remain monotonic and non-overlapping. Phase 4 global
advanced search, search index migrations, and the cross-platform LocalDB
test guard are preserved alongside the merged vendor roadmap and phases 1-3.

Validation (Docker .NET 8 SDK): build 0 errors; 191 tests pass across
all three test projects (64 + 18 + 109).
2026-07-24 13:38:20 -03:00
Alexandre Brandizzi
b1421de0b5 fix(vendors): address roadmap review findings 2026-07-24 11:49:57 -03:00
Arthur Bassi
edcdc10395 fix(work-orders): return 400 for invalid advanced-search custom date range
Map ArgumentException from datePreset=custom without dates to BadRequest so the endpoint matches the Phase 4 contract.
2026-07-24 10:01:11 -03:00
Alexandre Brandizzi
39829f7274 Merge branch 'codex/vendor-core-completion-backend' into codex/vendor-roadmap-completion-backend 2026-07-23 19:18:19 -03:00
Alexandre Brandizzi
4863d1fdaf feat(vendors): complete operations roadmap backend 2026-07-23 19:18:06 -03:00
Alexandre Brandizzi
5b4b538c16 fix(vendors): preserve company and phone integrity 2026-07-23 19:17:14 -03:00
Alexandre Brandizzi
8cf49afc2c feat(vendors): complete core vendor workflows 2026-07-23 17:02:40 -03:00
Alexandre Brandizzi
1162c68596
feat(vendors): add directory filters and details API (#25)
* feat(vendors): add directory filters and details API

* fix(vendors): preserve omitted status

* fix(vendors): align facet filtering

* fix(vendors): address directory review findings
2026-07-23 15:55:47 +00:00
Arthur Bassi
fa1eca8f89 fix(work-orders): make stacked tip build for CI quality gates 2026-07-17 13:18:46 -03:00
Arthur Bassi
3983f7667d feat(locations): add sites options endpoint and vendor contactName
Expose GET /api/locations/sites for the WO create wizard and include
vendor contactName on dropdown responses.
2026-07-17 10:36:32 -03:00
Arthur Bassi
dd2a805c24 fix(work-orders): return 400 for invalid advanced-search custom date range
Map ArgumentException from datePreset=custom without dates to BadRequest so the endpoint matches the Phase 4 contract.
2026-07-10 10:56:18 -03:00
Adam Moussa
1f3972ae49
Add calendar/events backend API (#8)
* Align EntityFrameworkCore.SqlServer and Tools to 8.0.8

* Add calendar/events backend API

Cherry-picked from main-backup (19994ef); scratch notes file removed.

* Require authentication on CalendarController

Security review found [Authorize] commented out, leaving all 6 calendar
endpoints anonymous. Enforce auth to match the API convention (17/23
controllers).

* Add CalendarController unit tests (xUnit + EF InMemory)
2026-06-22 18:46:46 -04:00