Commit graph

33 commits

Author SHA1 Message Date
Alexandre Brandizzi
65b04687bc fix(work-orders): honor edited service labels 2026-09-16 22:30:32 -03:00
Alexandre Brandizzi
33f517620b feat(work-orders): link service selections to registry 2026-09-16 18:02:57 -03:00
Arthur Bassi
e0139d4601 feat(work-orders): capture Site/Vendor/POC snapshot on Completed
Freeze effective live values on first Completed transition and project them on GET.
2026-09-10 15:46:25 -03:00
Arthur Bassi
a0fdd19934
fix(work-orders): accept image/jpg MIME and expose board MediaCount (#107)
Some checks are pending
Validate and deploy / Validate deployable source bundle (push) Waiting to run
Validate and deploy / Deploy shoc-backend-dev through Terraform (push) Blocked by required conditions
Validate and deploy / Deploy shoc-backend-staging to Elastic Beanstalk (push) Blocked by required conditions
Co-authored-by: Alexandre Brandizzi <alex_brandizzi@hotmail.com>
2026-09-09 00:10:52 +00:00
Arthur Bassi
7a0b91bcd6 feat(work-orders): persist board severity on create, patch, and search 2026-09-07 11:46:13 -03:00
Arthur Bassi
dcb757b404 fix(work-orders): persist empty apptTime as null scheduled instants
EOF
2026-08-31 10:49:54 -03:00
Arthur Bassi
14b85c64a8
Merge branch 'dev' into feat/sh-117-aveta-required 2026-08-25 17:19:30 -03:00
Arthur Bassi
7c7c6bc525 feat(work-orders): persist Aveta Extra Docs media category
Round-trip category 5 on media POST/PATCH/GET and project hasAvetaDocument so pending vs attached survives reopen.
2026-08-25 15:10:45 -03:00
Arthur Bassi
04958e6121 fix(work-orders): keep GET /board to scheduled-in-week rows only (SH-165) 2026-08-24 18:29:18 -03:00
Arthur Bassi
15315edf08 feat(work-orders): persist avetaRequired on board create, patch, and search
Expose avetaRequired and originalDate on list rows so the frontend can round-trip the Aveta checkbox and Reschedule hover.
2026-08-24 15:14:31 -03:00
Arthur Bassi
75d337df0f fix(work-orders): omit inactive primary vendor from board rows (SH-183)
Do not project VendorId/VendorName for Cancelled, Canceled, or Refused primary dispatches, and expose PrimaryDispatchStatus on the board DTO.
2026-08-20 13:22:12 -03:00
arthur.bassi
2222d04fcb Merge remote-tracking branch 'origin/dev' into feature/sh-218-additional-contacts 2026-08-18 20:52:34 -03:00
Alexandre Brandizzi
5386d6129d
Merge branch 'dev' into feature/sh-196-wo-uplifts 2026-08-18 17:46:38 -03:00
Arthur Bassi
92a3b3f045 chore(work-orders): merge origin/dev into SH-218 additional contacts
Keep IsAddOn create tests from dev alongside additional-contacts coverage.
2026-08-18 11:53:26 -03:00
Arthur Bassi
c9a80f5c79 fix(work-orders): restore SH-185 Schedule On Past Due and assert IsAddOn audit
Past Due follows ScheduledDate so Due Date alone cannot set or clear it. Auto-schedule and reschedule tests now expect the third IsAddOn audit field.
2026-08-17 10:36:03 -03:00
Arthur Bassi
36ef0b00f5 feat(work-orders): persist additionalContacts on create, board GET and PATCH (SH-218)
Add JSON column, DTO/mapper, create + PATCH field, board projection, FluentValidation,
and regression tests for additional POC contacts round-trip.
2026-08-13 16:11:36 -03:00
arthur.bassi
b81cfbb005 feat(work-orders): WO-scoped uplift endpoints and board summary (SH-196)
Expose workorders/{id}/uplifts list/create/cancel/revoke for the SH-196 dialog, aggregate upliftSummary on board rows, and add service/controller regression tests.
2026-08-13 14:49:56 -03:00
Arthur Bassi
97e042f552 feat(work-orders): persist IsAddOn frozen at create (SH-126)
Add set-once IsAddOn with server cutoff at create, board DTO exposure, legacy type-7 backfill, and Types=AddOn search compat. Aligns with FE PR #61 frozen contract.
2026-08-13 13:30:09 -03:00
Arthur Bassi
05dd262e80 fix(work-orders): derive Past Due from DueDate instead of ScheduledDate
Past Due must track the deadline (Due Date), not Schedule On. Keep dueDate and scheduledDate PATCH mutations independent so rescheduling alone does not clear Past Due.
2026-08-13 13:28:25 -03:00
Arthur Bassi
aaeeb90f1a feat(work-orders): expose pendingUpliftCount on board rows (SH-188)
Aggregate Pending uplift requests across all dispatches tied to a work
order so the board/search/detail contract can drive the Completed gate.
2026-08-12 09:43:10 -03:00
Arthur Bassi
1edcf479ae fix(work-orders): apply account scope across create and reads [SH-221]
Stamp WorkOrder.AccountId on all create paths and filter board/list/search/detail by server-derived account claims so scoped callers cannot cross accounts.

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-08-11 10:45:37 -03:00
Alexandre Brandizzi
d073a503d1 feat(work-orders): board completedDate + media categorize contract
Expose completedDate on PATCH /workorders/{id}/board so CompDoc can leave legacy EditWorkorder. Allow optional media category on upload, PATCH category afterward, and enforce JPG/PNG/MP4/MOV allowlist (SH-116).
2026-08-04 11:08:18 -03:00
Arthur Bassi
620a36af54
feat(work-orders): enrich board search overdue filters and 0-based paging (#23)
* feat(work-orders): enrich board search overdue filters and 0-based paging

* fix(work-orders): align stacked services with CI build

* fix(tests): pass userDataService in comment service unit test

* fix(work-orders): use dedicated overdue query flag

Stop treating WorkOrderType.Other as an overdue sentinel. Board and advanced search now accept overdue=true while types=Other filters real Other rows; combining both uses OR.

* test(work-orders): cover overdue date/status boundary and Other type-filter

Lock the PR #23 overdue regression boundary through the public advanced
search service. Prove overdue filtering is driven by past-due date plus
non-terminal status, not by the WorkOrderType.Other sentinel:
- Other + future/not-completed excluded from overdue
- past-due + Scheduled included; past-due + Completed/Canceled excluded
- types=[PM, Other] keeps real Other rows and does not pull past-due rows
- assert 0-based paging (Page=0) is preserved alongside overdue/type filters

---------

Co-authored-by: Arthur Bassi <arthur.winiarski.ranger@outlook.com>
Co-authored-by: Alexandre Brandizzi <alex_brandizzi@hotmail.com>
2026-07-24 21:12:03 +00:00
Alexandre Brandizzi
e5cf4cec09 merge: integrate origin/dev into PR #22 flag-color base
Brings in dev's Phase 5 (PR #17) + vendor PRs (#25/#28/#29) atop the
Phase 6/7 + flagColor base (PR #22). Preserves dev Phase 1-5 behavior and
PR #22 Phase 6/7 + flagColor behavior.

Conflict resolutions (16 files):
- Migrations Phase4_SearchIndexes/.Designer + Phase5_DomainEvents/.Designer:
  take dev (Phase4 incl. SQL Server SiteCode/InternalWONumber index-compat
  shrink fix; Phase5 identical). ModelSnapshot union: Vendor CompanyId index
  + Phase7 ServiceNotes/ExternalWorkOrderId index.
- ApplicationDbContext: keep dev SiteCode/InternalWONumber MaxLength (Phase1-5
  + unguarded model test) + HEAD CompletionDocTemplate/ExternalWorkOrderId.
- WorkOrderAuditService: unify on dev async staging API; convert Phase6
  CompletionService 2 call sites to await StageFieldChangedAsync (drops
  HEAD sync duplicate; only callers, no test refs).
- Hosted services: take HEAD (retry-on-failure, coherent with Phase7
  WorkOrderJobRunStateAccessor/OpsHealth). Program.cs keeps dev vendor DI
  (ClamAV/VendorDocumentScanWorker/ArgumentExceptionFilter) + HEAD Phase7.
- WorkOrderController: keep HEAD Phase6/7 service params + dev doc comment.
- VendorController/WorkOrderBoardCreateService/QueryFilters/appsettings:
  union / dev-correct.
- WorkOrderBoardUpdateServiceTests: union of HEAD (Phase6/7+flagColor) and
  dev (Phase1-5) test methods.

Verified WorkOrderType.Other (enum 99) is a legit category, not an overdue
sentinel; overdue uses dedicated OperationalFlags.PastDue + IsPastDue, and
'Overdue' is rejected as a WorkOrderType (no PR #23 import needed).

Removed dev duplicate Api.Options.WorkOrderJobRunState (HEAD defines it in
Services.Implementation alongside the Accessor; Services cannot reference Api).
2026-07-24 14:20:16 -03:00
Arthur Bassi
cc37a0283b fix(work-orders): keep FlagColor feature on this slice with its migration
Restore FlagColor model/API/tests here after the parent structured-notes PR dropped them, so this PR remains the coherent home for the FlagColor column and palette.
2026-07-21 09:42:10 -03:00
Arthur Bassi
33574c233b fix(work-orders): keep FlagColor out of structured-notes slice
Remove FlagColor model/API/tests from this PR so schema and EF model stay aligned with the structured-fields migration. FlagColor remains in the follow-on PR that adds its migration.
2026-07-21 09:38:34 -03:00
Arthur Bassi
ecc1db3726 feat(work-orders): add structured service notes POC and vendor fields
Persist primary/extra services, service notes, free-text POC, and
tech/vendor notes on create/patch/board/detail instead of embedding
them in description.
2026-07-17 10:37:23 -03:00
Arthur Bassi
88f9245fbf merge: sync Phase 1 board review fixes into Phase 2
Resolve conflicts in WorkOrderController and WorkOrderBoardService so Phase 2 merges cleanly into the Phase 1 base.
2026-07-10 10:41:36 -03:00
Arthur Bassi
c2d0bd45e3 fix(work-orders): address PR #13 review feedback
Return BadRequest for invalid board week window, remove duplicate unused board types, fix POC null guard, and document appt precedence and UTC Phase 1 assumptions.
2026-07-09 10:06:36 -03:00
Arthur Bassi
d040832b87 feat(work-orders): isolate phase 2 inline edit with optimistic concurrency
Deliver PATCH board field updates and drop phases 3-7 code from the branch while keeping phase 0/1 dependencies required to build and test.
2026-07-07 11:26:13 -03:00
Arthur Bassi
8efe4460bb fix(work-orders): complete Phase 1 board indexes, Service DTO and helper wiring
Add AssignTo+ScheduledDate and WorkOrderType indexes, expose service on board rows, and route data access through shared projection/filter helpers.
2026-07-07 10:11:04 -03:00
Arthur Bassi
ff53cb9fa6 feat(work-orders): add weekly board read API (Phase 1)
- GET /api/workorders/board with week window, Unscheduled section, and X of Y counts
- GET /api/workorders/lookups/dispatchers for SHOC filter avatars
- Board projection via WorkOrderBoardDataService with vendor/dispatch join and derived isPastDue
- Phase1_BoardIndexes migration (IX_workOrders_ScheduledDate)
- 5 board unit tests
2026-07-07 10:10:06 -03:00
Arthur Bassi
4f697f257a wip: work orders phases 1-7 (isolated from phase 0 foundation) 2026-06-30 10:09:48 -03:00