The parity test now also asserts which rows the drill-down lists: legacy
open rows (status in Status or in LegacyStatus, or none) are listed and
legacy closed, cancelled or assigned rows are not. Drops ticket keys
from comments.
A vendor could withdraw (or cancel) an uplift a dispatcher raised from the work
order. Withdraw and its cancel alias now refuse requests with createdby set,
using the portal's not-found response, and the portal read model reports
RaisedByVendor so the portal can hide Revise and Withdraw on those requests.
The strict date range made undated open work orders disappear for every
client that predates the includeDateless flag. The frontend on main sends
the all-weeks window (2000-01-01..2099-12-31) for "no range", the
1970-01-01..2099-12-31 window for the pinned Unassigned queue, and no date
input at all for the WO# duplicate lookup. None of those send the flag, so
deploying this backend before the frontend would have dropped undated WOs
from all three flows.
includeDateless is now optional. An explicit value still wins. When it is
omitted, a request with no date input or with an all-weeks Custom window
keeps its open undated rows, as before SH-391. Any other range stays
strict. The backend and frontend can therefore deploy in either order.
Adds MediaCounts (limits, current photos/videos, and the counts a new
completion version would see) so the portal can refuse an 11th photo or
4th video before uploading it. Uses the same count and replacement rule
the upload check enforces.
GET /dashboard/stats now returns unassigned: open (not Completed or
Canceled) work orders with no dispatcher in the selected period, within the
caller's server-derived account scope. It uses the same filters as the
Unassigned board search, so the Dashboard number equals the list it drills
into. A dispatcher-scoped Dashboard has no unassigned work and returns 0.
An explicit date range let every undated, non-terminal work order through,
so Unassigned plus a range still returned all ~1,780 unassigned rows. The
range now matches Schedule On, or the Target Week for week-only rows
(overlap), the same date the weekly board groups by. Undated rows are added
only when the caller sends includeDateless, which the client uses for
searches with no range selected and for the Unassigned queue.
Editing a work order's POC never reached the backend: no update path wrote
PocName/PocPhone/PocNotes, so the optimistic UI edit was lost on refetch and
the completion freeze captured the Site contact instead of the manual value,
and nothing was audited.
- Add tenant-scoped PATCH api/workorders/{id}/poc via new WorkOrderPocService
+ WorkOrderPocDataService: persists the override, stages FieldChanged audit
entries (which also write field locks so sync never overwrites a manual POC),
and enforces row-version concurrency and terminal-status read-only rules.
- Lock semantics (SH-190): a manual POC away from the Site's live contacts is
stored WO-level; an edit equal to a live Site contact (or blanking name+phone)
stores nothing so the WO follows the Site. PocCustomized exposes the state.
- Board projection, completion freeze and create now share one Site-contact
fallback (first non-deleted contact by SiteContactOrder) so a never-overridden
WO keeps following the Site, including at create when the wizard prefills it.
- Route contract baseline gains PATCH {id:int}/poc.
Adds the personal producers behind GET /api/notifications without changing its shape:
new assignments (SH-288), unanswered comments on work the user takes part in (SH-289),
@mentions, and decisions on uplifts the user requested (SH-215).
The uplift detail modal needs the work order's assigned dispatcher, the
requesting vendor's technician and the scheduled date. They now resolve
from the same effective work order and vendor as the existing queue row,
so the modal no longer depends on a separate work-order fetch that
account-scoped staff cannot read.
Adds GET /api/notifications, a per-user read model derived from live
work-order state: Unassigned (grouped, High), No Vendor and Aveta Missing
(per work order, Medium) and Vendor Conflict, account-scoped from claims
and ordered by section severity with a fixed reason tie-break.