The legacy create paths (WorkOrderDTOs, SyncService, the Blazor
WorkorderService) still write Status without LifecycleStatus. The board
status filter only matched LifecycleStatus. So an open unassigned row of
that kind was left out of the Unassigned tile and its drill-down list,
even though the Open tile in the same response counted it.
ApplyStatusFilter now reads a row with no LifecycleStatus by its legacy
status (LegacyStatus ?? Status), using the Phase0 backfill rules: known
text maps as LifecycleStatusMapper does, and anything else, blank
included, counts as Incomplete. The tile and /board/search share the
predicate, so the count still matches the list it opens.
A work-order request stores the requested increase, not a total. Letting
the vendor revise one after changes were requested rewrote RequestedNTE
as a total while it still read as a work-order request, corrupting its
amount and the NTE it would be approved to. Revise now answers not-found
for any request the vendor did not raise and leaves the row untouched.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Work-order requests store the requested increase in RequestedNTE; vendor
portal requests store the requested NTE total. The queue Delta, the
pending and approved exposure totals, the work-order uplift list, the
board summary and the notification Delta now all read one definition
(UpliftAmount) that honours both meanings and translates to SQL.
Approving a work-order request now adds its increase to the dispatch NTE
instead of replacing the NTE with the increase; vendor requests still end
at their requested total.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
The approvals header summed the whole RequestedNTE for work-order-path
requests, while each Pending row shows RequestedNTE - CurrentNTE. When a
work order already had an NTE the header overstated exposure by that NTE.
The header now sums the same Delta the rows display, over the same rows
the Pending tab lists (non-deleted request on a non-deleted dispatch).
The unused duplicate aggregate is removed so one definition remains.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
The strict date range made undated open work orders disappear for every
client that predates the includeDateless flag. The frontend on main sends
the all-weeks window (2000-01-01..2099-12-31) for "no range", the
1970-01-01..2099-12-31 window for the pinned Unassigned queue, and no date
input at all for the WO# duplicate lookup. None of those send the flag, so
deploying this backend before the frontend would have dropped undated WOs
from all three flows.
includeDateless is now optional. An explicit value still wins. When it is
omitted, a request with no date input or with an all-weeks Custom window
keeps its open undated rows, as before SH-391. Any other range stays
strict. The backend and frontend can therefore deploy in either order.
Approve, reject, request-changes, expiry and escalation staged their work
order audit with WorkOrderId = dispatch.WorkOrderId ?? 0. WorkOrderAuditLogs
requires a real work order, so any uplift on a dispatch without an owning
work order failed to save: the decision returned a 500 and the request stayed
Pending, and the expiry sweep failed on it every run.
The audit now goes to the work order the uplift resolves to through the
existing owner-or-linked read that revoke already uses. When none resolves,
the status change is saved on the request and no audit row is written.
The 10-photo / 3-video cap was a check-then-insert with no lock on both
upload surfaces, so two overlapping uploads could both take the last slot.
The board media upload and the vendor portal upload now run count, insert
and save inside ExecuteWorkOrderMutationAsync. GetMediaContent maps .heic
to image/heic.
Uplift creation now checks the actor's RequestUplifts permission, so the
ownership tests construct the service with the permission services and seed
their actor as an Admin.
Read the duration from the MP4/MOV movie header (moov/mvhd) on both the
dispatcher media endpoint and the vendor portal completion upload, so a
direct request cannot bypass the browser check. Unreadable metadata still
never blocks an upload.
The 10-photo / 3-video limit only counted dispatcher attachments, so vendor
portal uploads could push a work order past it (and vice versa). Count the
work order's current vendor documents alongside its attachments on both the
dispatcher media endpoint and the vendor portal. A new completion version
does not count the version it replaces.
Board create left the new primary dispatch with no WorkOrderId, so uplifts
created on those work orders were written to a dispatch the work order's
uplift reads never resolve: not listed, allowance never consumed, queue WO
number blank. The same orphan made ApptDate/vendor patches fail with
"A primary dispatch is required".
- Board create backfills Dispatch.WorkOrderId after the first save.
- Uplift create resolves its dispatch through the read-side scope
(non-deleted, owned or linked); otherwise the stable
"no primary dispatch" error.
- Data-only migration assigns existing orphaned primaries to the single
work order naming them primary; idempotent.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
The Elastic Beanstalk nginx proxy kept its 1 MB default body limit, so every
media upload over ~1 MB got an nginx 413 before reaching the API. Ship a
.platform nginx override (120M) in the bundle and assert it in the bundle
contract.
Apply the client-confirmed contract: photos up to 10 MB (JPEG/PNG/HEIC),
videos up to 100 MB (MP4/MOV), at most 10 photos and 3 videos per work order,
with stable generic rejection messages. The request ceiling (110 MB) sits
between the per-kind caps and the proxy so oversize files get the generic
message. The vendor portal accepts the same photo/video types and caps.
An explicit date range let every undated, non-terminal work order through,
so Unassigned plus a range still returned all ~1,780 unassigned rows. The
range now matches Schedule On, or the Target Week for week-only rows
(overlap), the same date the weekly board groups by. Undated rows are added
only when the caller sends includeDateless, which the client uses for
searches with no range selected and for the Unassigned queue.
Use the operation work order when staging uplift audit logs so a dispatch linked through DispatchWorkOrders cannot write the event to its primary work order. Add coverage for the cross-work-order fallback case.
The manual POC "follow the site" clear-rule compared the edit against every
live Site contact. A work order only ever displays one of them, so editing to
a different live contact (Site has Alice primary and Bob; WO shows Alice; edit
to Bob) matched, cleared the override, and left the row showing Alice with no
audit row written — the SH-379 symptom on a different input. A work order with
a linked WorkOrderContacts POC hit the same bug when the dispatcher typed the
Site's primary: the override cleared and the linked contact showed instead.
Compare the edit against the single contact the work order actually follows —
the linked WorkOrderContacts POC, or else the Site primary (ResolvePrimary) —
matching the board projection's override -> linked -> site precedence, and
store the override whenever the edit differs from it. The create path in
WorkOrderBoardCreateService had the same any-contact rule and gets the same
fix; a supplied PocContactId that is not a live Site contact leaves no follow
target, so the typed POC is stored.
Replaces MatchesAnySiteContact with Matches(name, phone, contact); comment and
PR-body wording updated to state the followed-contact rule. Adds tests for the
second-site-contact edit, the linked-contact-differs edit, and the
second-site-contact create case.
Mobile browsers attach an unreliable Content-Type to a picked file: empty or
application/octet-stream when the OS cannot classify it, and sometimes a
foreign-but-plausible type for a supported container (video/3gpp for an .mp4,
video/x-quicktime for a .mov). The media allowlist already resolved empty and
octet-stream types from the extension, but a concrete foreign type was rejected
outright, so a real .MP4/.MOV picked on a phone passed the client dialog and was
refused by the API.
Any declared type that is not itself on the allowlist now falls back to the
extension. The extension pairing and magic-byte signature still decide, so the
accepted set of files is unchanged; an allowlisted declared type stays
authoritative and must still match its own extension.
Editing a work order's POC never reached the backend: no update path wrote
PocName/PocPhone/PocNotes, so the optimistic UI edit was lost on refetch and
the completion freeze captured the Site contact instead of the manual value,
and nothing was audited.
- Add tenant-scoped PATCH api/workorders/{id}/poc via new WorkOrderPocService
+ WorkOrderPocDataService: persists the override, stages FieldChanged audit
entries (which also write field locks so sync never overwrites a manual POC),
and enforces row-version concurrency and terminal-status read-only rules.
- Lock semantics (SH-190): a manual POC away from the Site's live contacts is
stored WO-level; an edit equal to a live Site contact (or blanking name+phone)
stores nothing so the WO follows the Site. PocCustomized exposes the state.
- Board projection, completion freeze and create now share one Site-contact
fallback (first non-deleted contact by SiteContactOrder) so a never-overridden
WO keeps following the Site, including at create when the wizard prefills it.
- Route contract baseline gains PATCH {id:int}/poc.
The uplift detail modal needs the work order's assigned dispatcher, the
requesting vendor's technician and the scheduled date. They now resolve
from the same effective work order and vendor as the existing queue row,
so the modal no longer depends on a separate work-order fetch that
account-scoped staff cannot read.
#144 branched from the SH-210 decision-actions commit before the SH-207/SH-208
read-contract corrections landed, so it re-implemented workOrderClosed,
attachmentCount, decidedByName, and pendingExposureTotal with stale semantics:
it projected WorkerOrderNumber (the CRM external id) instead of InternalWONumber
(what the board renders) and summed raw RequestedNTE, which double-counts the new
NTE total on vendor-portal rows across sequential approvals.
Merge origin/feat/ab/sh-210-uplift-decisions (#141, what lands) in and resolve
every conflict in #141's favour, so those fields and their granted-amount
exposure math now come from #141 rather than being duplicated here. Keep only the
two deltas #144 actually adds on top of #141:
- attachmentCount counts non-deleted UpliftEvidence documents on the dispatch,
not every completion document, so completion photos no longer inflate the chip;
- the queue read resolves the effective work order via the primary-plus-linked
(DispatchWorkOrders) convention the sibling reads use, so a dispatch linked only
through that table surfaces its WO context, closed flag, and exposure. Covered
by an in-memory test and a SQLite relational test that proves the fallback
translates to SQL.
Drop the superseded attachment-count test that asserted completion documents
count, and align the relational test to seed InternalWONumber.