The board and slide-over cancel a work order through the lifecycle status
patch, which set Canceled without touching uplifts, so a pending uplift
stayed in the approval queue. A patch to Canceled now withdraws pending
uplifts in the same save, each with its own uplift_cancel audit entry, and
runs under the per-work-order gate uplift create uses.
A standalone severity patch on an Overdue WO still stores the value,
because the board patches severity before type when correcting Overdue
to Emergency/Reactive and that write must not be dropped or rejected.
Project the severity as null for Overdue in the board row mapping, which
also feeds the PATCH response, search results and the detail view, so a
stored value never surfaces on a type that carries no severity.
The board sends one PATCH per field, severity before workOrderType, so
correcting an Overdue work order to Emergency or Reactive patches the
severity while the stored type is still Overdue. Dropping or rejecting a
severity patch for the current type would leave the corrected Emergency
work order with no severity. Overdue's no-severity rule is enforced when
the type changes, not on the severity patch.
Overdue (8) is a dispatcher-assigned type, separate from the derived
past-due overlay. It takes no severity, resolves services and
completion-doc templates from the PM catalog, and filters as its own
type. The past-due flag now narrows a type filter instead of widening it,
and the dashboard breakdown partitions by stored type.