Commit graph

3 commits

Author SHA1 Message Date
Adam Moussa
bbc113497a
feat(3cx): sync office department blfs via xapi (PLAT-116) (#80)
Some checks failed
Deploy / deploy (push) Has been cancelled
* feat(3cx): sync office department BLFs via XAPI

Keep unlock and lockdown keys in the templates and write colleague plus shared-parking BLFs per extension so phones skip their own line.

* fix(3cx): preserve parking BLF IDs and fail the job on PATCH errors
2026-08-27 14:58:55 -04:00
Adam Moussa
7c626c960e Apply display settings to SP template — both templates now match
Backlight dims to level 1 after 5 min, screensaver and power saving disabled.
2026-04-23 11:00:00 -04:00
Adam Moussa
2c9b86367b Add 3CX provisioning templates for Yealink T54W with door unlock key
Two variants:
- yealinkT54W-door-unlock.ph.xml — line key 2 as door unlock URL
- yealinkT54W-door-unlock-with-sp.ph.xml — line key 2 as door unlock, keys 3-5 as shared parking SP1-3
2026-04-22 19:43:26 -04:00