This repository has been archived on 2026-08-04. You can view files and clone it, but cannot push or open issues or pull requests.
orchestrator/agent-team/agent_team
Adam Moussa e42b910a80 fix(agent-team): plan-gate approve routes into the build subgraph (not END)
Discovered while smoke-testing the #60 builder fix on the R720: a task that
reaches the human plan-gate and is APPROVED never built. The gate's
GATE_APPROVE_ROUTE was hard-wired to END in build_graph, so plan_gate_node set
phase=BUILD/status=ACTIVE and the graph terminated WITHOUT entering the build
subgraph — the task wedged at phase=build with no build, no error. Only the
reviewer's auto-approve path (review -> build_node) reached the builder; every
human-gate-approved plan silently dead-ended.

The P3 splice only repoints the REVIEW node's build route to BUILD_NODE; the
plan_gate edges are independent and were never updated, so even with P3 fully
wired the gate approve went to END. _apply_plan_decision's 'settle exactly as
an auto-approved plan' intent was broken by the edge map.

- graph.py: when build_verify (P3) is wired, point GATE_APPROVE_ROUTE at
  BUILD_NODE (mirroring REVIEW's BUILD_ROUTE: BUILD_NODE); keep END when P3 is
  inert (P2 approved-plan terminus). LangGraph resolves the forward reference
  to BUILD_NODE at compile().
- tests: gate-approve with P3 wired traverses BUILD -> VERIFY -> DONE on an
  authenticated CI pass, and parks at VERIFY (never fabricates a pass) when the
  CI fetcher is inert. Existing P2 gate-approve -> END behavior unchanged.
2026-06-24 14:13:11 -04:00
..
db fix(agent-team): init_db drives migrate() so the version stamp actually advances 2026-06-24 12:18:22 -04:00
nodes fix(agent-team): builder uses agentic invoker config (read-only tools + turn headroom) 2026-06-24 13:13:28 -04:00
transport fix(agent-team): centralize safe decision mapping + remove free-text abandon hair-trigger 2026-06-24 11:48:04 -04:00
__init__.py Plane 2 foundation: interfaces, SQLite schemas, state-store, billing seam 2026-06-17 15:16:12 -04:00
api.py fix(ws1): harden HTTP API + declare fastapi/uvicorn deps 2026-06-23 12:27:23 -04:00
billing.py Plane 2 foundation: interfaces, SQLite schemas, state-store, billing seam 2026-06-17 15:16:12 -04:00
ci_fetcher.py fix(agent-team): remediate C1 security-review BLOCK (2 HIGH + MED/LOW) 2026-06-23 19:52:04 -04:00
ci_gate.py feat(agent-team): P3 Phase-0 box-side build->dispatch->verify (WIP) 2026-06-23 19:52:04 -04:00
ci_watcher.py fix(agent-team): close P3 async-resume BLOCKs (durable CI-watcher wiring) 2026-06-23 19:52:04 -04:00
coordinator.py feat(agent-team): Slack decision surface for the plan-review gate (Phase B3) 2026-06-23 21:03:54 -04:00
dashboard.py fix(agent-team): scrub exception text from /api/state + /api/topology errors 2026-06-23 17:28:22 -04:00
deadline_timer.py Add Plane-2 leaf scaffold (pipeline graph, nodes, HITL, transports, CI) 2026-06-17 15:16:12 -04:00
decisions.py fix(agent-team): centralize safe decision mapping + remove free-text abandon hair-trigger 2026-06-24 11:48:04 -04:00
dispatcher.py fix(agent-team): close P3 async-resume BLOCKs (durable CI-watcher wiring) 2026-06-23 19:52:04 -04:00
draft_pr_monitor.py feat(agent-team): P3 Phases A/B/E — safety tooling, wiring, docs 2026-06-23 19:52:04 -04:00
graph.py fix(agent-team): plan-gate approve routes into the build subgraph (not END) 2026-06-24 14:13:11 -04:00
invoker.py fix(agent-team): builder uses agentic invoker config (read-only tools + turn headroom) 2026-06-24 13:13:28 -04:00
invoker_multi.py fix(ws1): skip fastapi TestClient tests when fastapi absent + ruff format 2026-06-23 11:40:46 -04:00
ledger.py feat(agent-team): add pending_questions.kind discriminator + migration (Phase B1) 2026-06-23 21:03:53 -04:00
operator_cli.py Add Plane-2 leaf scaffold (pipeline graph, nodes, HITL, transports, CI) 2026-06-17 15:16:12 -04:00
recovery.py Add Plane-2 leaf scaffold (pipeline graph, nodes, HITL, transports, CI) 2026-06-17 15:16:12 -04:00
responder.py feat(agent-team): one Slack thread per task — root "Task received" message + threaded questions/milestones 2026-06-23 15:49:40 -04:00
resume_worker.py fix(agent-team): close P3 async-resume BLOCKs (durable CI-watcher wiring) 2026-06-23 19:52:04 -04:00
state_store.py Plane 2 foundation: interfaces, SQLite schemas, state-store, billing seam 2026-06-17 15:16:12 -04:00
status_page.py fix(agent-team): scrub exception text from /api/state + /api/topology errors 2026-06-23 17:28:22 -04:00
task_model.py feat(agent-team): resumable plan-review gate in the graph (Phase B2a) 2026-06-23 21:03:53 -04:00
topology.py feat(agent-team): LangGraph-introspected topology + read-only dashboard API 2026-06-23 17:15:16 -04:00