This repository has been archived on 2026-08-04. You can view files and clone it, but cannot push or open issues or pull requests.
orchestrator/agent-team/docs/P3-PHASE0-DESIGN.md

88 lines
4.8 KiB
Markdown
Raw Normal View History

# P3 Phase 0 — box-side build→dispatch→verify integration (design decision)
Branch: `feat/agent-team-p3-box-integration`. This note records the load-bearing
design decision for Phase 0 so the security/cross-review gates and the parallel
WebUI session have the rationale in-tree. It is the result of the `/sh-plan-review`
loop (3 rounds, GPT-4.1) + a code-level investigation of the as-built dispatcher,
ci_fetcher, and coordinator execution model.
## Context (verified on-disk, 2026-06-23)
The CI apply/verify workflow is **already live + provisioned** (the `agent-apply`
environment, the `AGENT_APPLY_APP_*` secrets, and dispatched runs all exist as of
2026-06-22). What is **not** built is the box-side integration that makes a task
flow through BUILD → (trigger CI) → VERIFY automatically:
- `dispatcher.py` fires `gh workflow run` but never captures the resulting run id.
- `dispatch_invoker` returns `{}` — nothing writes `state["run_id"]`.
- `ci_fetcher` reads `state["run_id"]` (so it always fails closed → gate BLOCKs).
- The graph orders BUILD → VERIFY → DISPATCH, but VERIFY needs a CI conclusion
that only exists *after* DISPATCH triggers CI. (semantic inversion)
## Decision 1 — node order: BUILD → DISPATCH → VERIFY (reorder)
DISPATCH triggers the CI run and must run *before* VERIFY reads its conclusion.
The P3 subgraph is reordered accordingly (graph.py + build_verify_subgraph.py).
The reorder adds **no new graph nodes** (BUILD/DISPATCH/VERIFY already exist), so
the parallel WebUI branch's graph introspection + NODE_META coverage are
unaffected; only edge wiring changes.
## Decision 2 — CI wait: async resume-on-CI-complete, NOT a blocking poll
A CI run takes ~7 min. The coordinator is a single durable daemon (LangGraph
`interrupt()`/resume + a `tick()` maintenance sweep). A multi-minute *blocking*
VERIFY node would stall the tick loop and every other task. The durable
interrupt/resume machinery already exists for exactly the "external event resumes
a suspended task" shape (the Slack responder; the deadline timer). So:
BUILD → DISPATCH (push branch, trigger CI, capture run_id, suspend)
→ [CI-watcher resumes on terminal conclusion] → VERIFY (read result, gate)
DISPATCH captures `run_id` + `dispatched_at` into state and the task suspends. A
new **CI-watcher** (a `tick()`-driven sweep, mirroring `deadline_timer`) polls the
in-flight `run_id`s read-only and resumes each task once its run reaches a
terminal conclusion (or its `dispatched_at` + timeout elapses → park). VERIFY then
reads the authenticated conclusion via the existing read-only fetcher and the
pure-code gate decides pass/fail. The LLM remains a fix-proposer only.
## Decision 3 — run_id capture is poll-based + correlation-tagged (anti-race)
`gh workflow run` does not return a run id. The dispatcher polls
`gh run list --workflow … --json databaseId,headBranch,createdAt,event` filtered
to this task's **unique per-dispatch head branch** + a per-dispatch
**correlation tag** (a nonce carried as a workflow input and echoed in the run),
bounded to runs created after the dispatch timestamp. This unambiguously matches
the dispatched run even with multiple tasks or rapid re-dispatch. A `None`/unfound
run_id fails closed (the gate BLOCKs / the task parks) — never a vacuous pass.
## Decision 4 — per-task `expected_run_id`
`VerifierConfig.expected_run_id` was a static wiring-time constant. It is now
resolved per-task from `state["run_id"]` (the id the dispatcher captured), so the
gate binds each task's verdict to its own dispatched run and rejects a substituted
run id.
## Decision 5 — fail-safe serve default
Per Adam's decision the bound P3 wiring becomes the new `serve` default. Because
the wiring factories are called eagerly at graph-build, the binding is wrapped so
a missing `AGENT_TEAM_REPO_OWNER`/`_NAME` / CI-read token degrades to the INERT P3
path (task parks, one WARNING + a `#agent-team` inert-mode notice) — never a
`RuntimeError` at serve-start that would crash-loop the daemon.
## Out of scope (tracked follow-ups)
- The §4.3 box-native diff transport (signed artifact / branch-only token) that
would let the always-on box trigger CI without operator credentials. Until then,
the branch push + `gh workflow run` use operator-host credentials (the box holds
no standing write token).
- Tier-3 fixer off `--dry-run`; the cross-plane checker→draft-PR loop.
## Coordination with the WebUI branch (`feature/agent-team-webui-makeover`)
Shared files: `graph.py` (they wrap nodes via `_instrument`; we reorder edges),
`coordinator.py` (both edit the `build_graph(...)` call block). WebUI merges
first; this branch rebases onto the new `main` before deploy. Wrapper composition:
`instrument(failsafe(node))` so a fail-safe park is still logged. The
`project_r720_agent_team` memory fix is owned by the WebUI session.