mirror of
https://github.com/Sea-Haven-Industries/open-swe.git
synced 2026-09-30 23:13:15 +00:00
|
Some checks are pending
Build & publish app artifacts / Publish + deploy (dev) (push) Waiting to run
Build & publish app artifacts / Publish + deploy (prod) (push) Waiting to run
Infra CD / Infra CI (pre-deploy) (push) Waiting to run
Infra CD / Deploy open-swe-dev (push) Blocked by required conditions
Infra CD / Deploy open-swe-prod (push) Blocked by required conditions
Agent CI / Agent lint (push) Waiting to run
Agent CI / Agent format check (push) Waiting to run
Agent CI / Agent unit tests (push) Waiting to run
Agent CI / Playwright E2E (push) Waiting to run
T20 CD safety nets. Two gaps closed before the first real prod deploy: 1. Promotion gate. promote_dev_to_prod.yml previously fast-forwarded dev→main unconditionally. It now hard-gates on check-dev-green.sh: every check-run on the dev HEAD must be completed+passing AND the Agent CI suite (lint/format/unit/E2E) must be present+success, or the promotion blocks (fails safe on a missing/renamed check). The promote run excludes its OWN check-run by run-id (unforgeable), never by the mutable name "promote", so a colliding red check cannot hide. Fields are read with a 0x1F separator so an empty conclusion (every in_progress check) cannot shift columns. ci.yml now also runs on push:dev so dev HEAD actually carries that signal (a PR check alone can be admin-merged past). 2. Rollback + last-good. publish-and-deploy.sh advances releases/last-good/ only after a successful roll (deploy.sh gates on `systemctl is-active`), and makes releases/latest/ transactional — reverting to the prior release if the roll fails so a replaced box never self-deploys a broken release. New rollback.yml + rollback.sh re-point latest at last-good (or an explicit sha) and re-fire the deploy; prod is gated by the `prod` Environment approval, same as a deploy. The shared fire/wait/aggregate-gate logic is factored into roll-box.sh (used by both forward and backward rolls). Least-privilege: drop the unused s3:DeleteObject from the app deploy role — publish/rollback/deploy only Get+Put (S3-to-S3 copy), and the rollback fallback now depends on immutable release history staying intact. Lifecycle expiry (not CI) handles old-version cleanup. Gate logic unit-tested (7 cases + jq round-trip). IAM change + release-safety control cross-reviewed by GPT-4.1: APPROVE, no blocks. Claude-Session: https://claude.ai/code/session_01DMhLf4G5V8MStJQyAW95hi |
||
|---|---|---|
| .. | ||
| aspects | ||
| constructs | ||
| config.ts | ||
| open-swe-iam-stack.ts | ||
| open-swe-stack.ts | ||