Commit graph

2 commits

Author SHA1 Message Date
Adam Moussa
35bc9e22f4
ci: promote dev → prod via fast-forward (not force-push from main) (#2)
* ci: promote dev to prod via fast-forward instead of force-pushing main

Repoints the daily promotion workflow to feed prod from the dev integration
trunk (prod <- dev) rather than force-pushing the upstream mirror (main).
Uses a fast-forward push so a release can never rewrite prod history.

* fix: sort imports in aegra_entry.py to unblock dev CI

The Sea Haven deployment commit left aegra_entry.py with an unsorted import
block (ruff I001), which fails the required 'Agent lint' check and blocks all
merges into dev. Apply the import-sort autofix.
2026-06-26 11:20:10 -04:00
Johannes du Plessis
ce8fe0b142
ci: nightly promote of main to prod for LangGraph deploys (#1285)
Adds a scheduled workflow that force-pushes main onto a prod branch at
08:00 UTC (midnight PST / 1am PDT). The LangGraph deployment will track
prod instead of main, so routine merges no longer trigger redeploys
that cancel in-flight 30-minute coding runs. workflow_dispatch is
retained for hotfixes that need to ship immediately.
2026-05-09 01:15:26 +00:00