Commit graph

4 commits

Author SHA1 Message Date
Adam Moussa
430a1cdff9
ci: re-home prod promotion into a gated promote-to-main workflow (PR1: managed-LGC migration) (#63)
* ci: re-home prod promotion into a gated promote-to-main workflow

Migrate the prod-deploy gate to managed LangGraph Cloud (git-connected to
`main`) + Vercel. Under managed, a push to `main` auto-deploys prod, so the
dev -> main fast-forward IS the prod deploy trigger -- the bespoke AWS CD step
is obsolete and already gone from this workflow.

Re-home `promote-dev-to-prod.yml` -> `promote-to-main.yml`:
- gate the promote job on the `prod` GitHub Environment (required reviewer
  amoussa1229), restoring the manual prod-approval that the retired AWS CD job
  used to carry;
- drop the nightly auto-promote cron -- a scheduled auto-promotion conflicts
  with a manual approval gate now that the push deploys prod; promotion is
  workflow_dispatch only;
- keep the dev-HEAD-fully-green precondition and the seahaven-promotion App
  fast-forward push (sole non-admin bypass actor on `main` ruleset 18238334).

Update the companion check-dev-green.sh filename reference.

* ci: refuse promote-to-main dispatch from any ref other than dev

Defense-in-depth atop the already-pinned `ref: dev` checkout: workflow_dispatch
runs the workflow definition from the launched ref, so reject a non-dev dispatch
before the App token is minted. Surfaced by the GPT-4.1 cross-review of #63.
2026-06-29 19:49:21 -04:00
Adam Moussa
9acf071ae4
fix: make dev->main promotion push succeed via bypass-actor App token (#49)
Some checks are pending
Build & publish app artifacts / Publish + deploy (dev) (push) Waiting to run
Build & publish app artifacts / Publish + deploy (prod) (push) Waiting to run
CI / Lint (push) Waiting to run
CI / Format check (push) Waiting to run
CI / Unit tests (push) Waiting to run
CI / Playwright E2E (push) Waiting to run
The nightly promote fast-forwards main to a fully-green dev HEAD, but the
push (as github-actions[bot]) is rejected by the main ruleset: it requires
PRs + a status check and the default token is not a bypass actor, so a
direct ref push can never land regardless of fast-forwardability. The
prior comment claiming protection 'only rejects non-FF' was wrong.

Mint a GitHub App installation token (actions/create-github-app-token,
SHA-pinned) and push with it; the App must be added to the main ruleset's
bypass actors out-of-band. The promoted commit already passed every check
on dev (gated by check-dev-green.sh), so re-gating it via a PR on main is
redundant.

Also fix a gate self-poison: a stale failed 'promote' check-run from a
prior run on the same dev HEAD blocked every subsequent gate run (it was
excluded only by the current run_id). Exclude prior promote check-runs
too, scoped to name=='promote' AND a /actions/runs/ details_url so an
external app cannot hide a real failing check by naming it 'promote'; the
positive REQUIRED_CHECKS allow-list stays authoritative.

Gates: GPT-4.1 cross-review APPROVE (no security regression). Unit-tested:
stale promote ignored -> PASS; real failure / external promote / missing
required check -> BLOCK. shellcheck clean (also fixed a pre-existing
SC2295 on the run_id match).
2026-06-28 21:42:50 -04:00
seahaven-openswe[bot]
3af0bd5e16
ci: align workflows with Sea Haven CI/CD handbook (#29)
* Align workflows with Sea Haven CI/CD handbook

Bring the workflow suite in line with the handbook: bump
actions/checkout to v7 (Node 24 runtime, already standardized),
kebab-case the two snake_case workflow filenames, and add the
org-standard Labeler caller and Dependency Review gate so vulnerable
or disallowed-license deps and unlabeled PRs are caught automatically.

File renames only — job/check display names are unchanged, so the
promotion gate's REQUIRED_CHECKS and branch-protection required
checks are unaffected.

Refs: INFRA-115

* Drop Agent prefix from CI workflow + job names

The handbook names workflows for what they do (CI, Deploy, Labeler),
not the component they run, matching .github and afterhours-shift-manager.
Rename the suite to CI and its jobs to Lint / Format check / Unit tests,
and keep the promotion gate's REQUIRED_CHECKS in sync.

Refs: INFRA-115

---------

Co-authored-by: seahaven-openswe[bot] <296972425+seahaven-openswe[bot]@users.noreply.github.com>
2026-06-27 21:47:25 -04:00
Adam Moussa
3224d7abf4
ci: gate dev→prod promotion on green checks + add rollback safety net (#28)
Some checks are pending
Build & publish app artifacts / Publish + deploy (dev) (push) Waiting to run
Build & publish app artifacts / Publish + deploy (prod) (push) Waiting to run
Infra CD / Infra CI (pre-deploy) (push) Waiting to run
Infra CD / Deploy open-swe-dev (push) Blocked by required conditions
Infra CD / Deploy open-swe-prod (push) Blocked by required conditions
Agent CI / Agent lint (push) Waiting to run
Agent CI / Agent format check (push) Waiting to run
Agent CI / Agent unit tests (push) Waiting to run
Agent CI / Playwright E2E (push) Waiting to run
T20 CD safety nets. Two gaps closed before the first real prod deploy:

1. Promotion gate. promote_dev_to_prod.yml previously fast-forwarded
   dev→main unconditionally. It now hard-gates on check-dev-green.sh:
   every check-run on the dev HEAD must be completed+passing AND the
   Agent CI suite (lint/format/unit/E2E) must be present+success, or the
   promotion blocks (fails safe on a missing/renamed check). The promote
   run excludes its OWN check-run by run-id (unforgeable), never by the
   mutable name "promote", so a colliding red check cannot hide. Fields
   are read with a 0x1F separator so an empty conclusion (every
   in_progress check) cannot shift columns. ci.yml now also runs on
   push:dev so dev HEAD actually carries that signal (a PR check alone
   can be admin-merged past).

2. Rollback + last-good. publish-and-deploy.sh advances
   releases/last-good/ only after a successful roll (deploy.sh gates on
   `systemctl is-active`), and makes releases/latest/ transactional —
   reverting to the prior release if the roll fails so a replaced box
   never self-deploys a broken release. New rollback.yml + rollback.sh
   re-point latest at last-good (or an explicit sha) and re-fire the
   deploy; prod is gated by the `prod` Environment approval, same as a
   deploy. The shared fire/wait/aggregate-gate logic is factored into
   roll-box.sh (used by both forward and backward rolls).

Least-privilege: drop the unused s3:DeleteObject from the app deploy
role — publish/rollback/deploy only Get+Put (S3-to-S3 copy), and the
rollback fallback now depends on immutable release history staying
intact. Lifecycle expiry (not CI) handles old-version cleanup.

Gate logic unit-tested (7 cases + jq round-trip). IAM change +
release-safety control cross-reviewed by GPT-4.1: APPROVE, no blocks.

Claude-Session: https://claude.ai/code/session_01DMhLf4G5V8MStJQyAW95hi
2026-06-27 20:21:59 -04:00